Technical services
AC Ducting & Duct Installation in Dubai
AC ducting sized, fabricated and installed for villas, apartments, offices, shops and restaurants, with joints sealed, ducts insulated and airflow balanced. Available across Dubai, with a two hour response for urgent work, and in the prime communities of Abu Dhabi by appointment. A supervisor visits first, and the written quotation follows before any work begins.
- Quotation
- Written, after a visit
- Response
- 2 hours in Dubai
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

AC Ducting & Duct Installation at a glance
| Service | AC Ducting & Duct Installation |
|---|---|
| Also known as | AC ducting, duct installation, duct work, HVAC ducting, duct fabrication |
| Location | Dubai and the prime communities of Abu Dhabi |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | One to three days for most villas and fit out units |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Two hours in Dubai for urgent work, planned work within 48 hours |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
A ducted AC is only as good as the ductwork hidden above the ceiling. Ducts that are too small are noisy and starve the far rooms, and in Dubai humidity any gap in the insulation sweats and drips onto the ceiling below. Our own technicians work out the airflow each room needs, then fabricate, hang, seal and insulate the ducts and balance the system before handover.
- Site survey of the AC unit, the ceiling void and the existing duct routes
- Duct sizes worked out from the airflow each room needs
- Supply and return ducts in galvanised steel sheet or pre insulated panel
- Joints sealed with duct sealant and foil tape
- Insulation with a continuous vapour barrier
- Short flexible connections to each diffuser, supported so they cannot sag
- Volume dampers, grilles and diffusers fitted and set
- Airflow balanced room by room and joints checked for leaks
- Checked against our 14 Point Standard, with photographs before and after
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Talk to a supervisor about AC ducting & duct installation today.
Why choose The MELLS for AC ducting & duct installation
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every AC ducting & duct installation job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Duct types and where each is used
| Duct type | Where it is used | Note |
|---|---|---|
| Galvanised steel sheet | Main supply and return runs, plant rooms and exposed ducts | Wrapped on site in insulation with a vapour barrier |
| Pre insulated panel | Villas, apartments and shallow ceiling voids | Light to hang, and the insulation is part of the panel |
| Flexible duct | The short last connection to a diffuser | Loses airflow when it is long, crushed or sagging |
| Grease rated kitchen exhaust duct | Above the cooking line in restaurants and cafes | Access doors for cleaning, and a route agreed with the building |
| Bathroom and dryer exhaust duct | Bathrooms, laundries and utility rooms | Taken to the outside, never left open in the ceiling void |
| Fresh air duct | Offices, shops and sealed apartments | Tower connections are coordinated with building management |
What your quotation depends on
A quotation for AC ducting & duct installation follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
AC Ducting & Duct Installation services in Dubai and Abu Dhabi
Each one has its own scope and method.
AC Duct Installation
Duct Fabrication
Duct Replacement
Duct Repair and Sealing
Duct Insulation
Flexible Duct Installation
Grille and Diffuser Installation
Kitchen Exhaust Ducting
Bathroom Exhaust Fan and Ducting
Fresh Air Ducting
Dryer Vent Ducting
Duct Modification for Fit Out
Pre Insulated Ducting
Galvanised Steel Ducting
Volume Dampers and Air Balancing
Duct Leak Detection
Villa Ducting Works
Office Ducting Works
Restaurant Ducting Works
Shop and Showroom Ducting Works
AC Duct Camera Inspection
Fresh Air Duct Cleaning
Dryer Vent Cleaning
Duct Acoustic Lining Replacement
AC Ducting & Duct Installation by community
Show all 70
Questions about AC ducting & duct installation
What does AC ducting & duct installation include?
AC ducting sized, fabricated and installed for villas, apartments, offices, shops and restaurants, with joints sealed, ducts insulated and airflow balanced. The work includes site survey of the AC unit, the ceiling void and the existing duct routes; duct sizes worked out from the airflow each room needs; supply and return ducts in galvanised steel sheet or pre insulated panel.
How much does AC ducting & duct installation cost in Dubai?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides AC ducting & duct installation in Dubai?
The MELLS provides AC ducting & duct installation in Dubai. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does AC ducting & duct installation take?
Typically one to three days for most villas and fit out units. The time for your property is confirmed with the quotation.
Why is water dripping from the ceiling under my AC duct?
Most often the insulation or its vapour barrier has a gap, so humid air reaches the cold metal and condenses. A blocked drain line can look the same from below, so we check both before any repair is proposed.
Why are some rooms colder than others?
The far rooms are usually short of air. The ducts may be undersized, a flexible duct may be crushed, or the branches may have no dampers. We measure the airflow at each outlet, correct the duct and balance the system.
Which is better, galvanised steel or pre insulated duct?
Both work well when they are installed properly. Steel is stronger and suits long main runs, plant rooms and exposed ducts. Pre insulated panel is lighter and suits homes with shallow voids. We recommend one after seeing the site.
Does the building need to agree to duct changes?
In towers and malls, changes to the ducts, fire dampers or fresh air system are coordinated with building management. What the building asks for is identified at the site visit, and we prepare the paperwork.
Does the ceiling have to come down?
Not always. Tile ceilings lift out and go back. In a gypsum ceiling we cut openings where the work is and close them afterwards, leaving access panels under the unit and at the dampers.
Do you install AC ducting in Dubai?
Yes. We install, replace and alter AC ducting in villas, apartments, offices, shops and restaurants across Dubai. A site visit measures the ceiling void and the AC unit before the scope is put in writing.
How do I choose a company for AC ducting & duct installation in Dubai?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
How do I prepare for AC ducting & duct installation?
Clear access to the units, panels or areas to be worked on and note any faults you have noticed. The supervisor confirms anything else at the site visit.
Do I need to provide any products or equipment?
No. Products, tools and machines come with the crew. Any materials the job needs, such as paint or parts, are listed in the written quotation.
What if I am not happy with the result?
Tell the supervisor at handover or call us. Anything that fails our check is put right free of charge within 48 hours.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
