Town Square
Bathroom Painting in Liva, Town Square
Bathroom ceilings and upper walls are washed with an antifungal solution, sealed and finished in a moisture resistant paint made for steam, with sealant lines and tiles masked off. The MELLS carries this out in Liva, Town Square with its own directly employed team and a named supervisor. A supervisor visits first, and the written quotation follows before any work begins.
- Quotation
- Written, after a visit
- Response
- 2 hours in Dubai
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Bathroom Painting at a glance
| Service | Bathroom Painting |
|---|---|
| Location | Liva, Town Square, Dubai |
| Property types | Apartments |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Usually one to three days, confirmed with the quotation |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | Wet film thickness checked on every coat and an adhesion test at handover |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Two hours in Dubai for urgent work, planned work within 48 hours |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
Interior and exterior painting by our own painters, with surfaces properly prepared, furniture fully protected and wet film thickness checked on every coat. A good paint finish is mostly preparation. Dubai walls move with heat, hairline cracks open at ceiling joints, and coastal air and irrigation mark exterior walls within a few seasons. We repair and prime before we paint, apply the system named in your quotation and leave the home clean enough to move straight back into.
- Mould killed and washed off before any paint is opened
- Flaking paint scraped back to a sound edge and feathered
- Stain blocking primer over water marks and old mould shadows
- Two coats of moisture resistant mid sheen paint on ceiling and walls
How we carry out bathroom painting
Paint in a bathroom fails from behind and from the surface at once, so the work starts with cleaning. Black spotting is treated with an antifungal wash, left to dwell and rinsed, then the room is dried with the extractor running. Loose and blistered paint is scraped to a firm edge, the step is filled and sanded, and water stains get a stain blocking primer. The finish is a moisture resistant acrylic in a mid sheen, applied in two coats, and the shower is left unused until the following day so the film can harden.
Most bathrooms in Dubai apartments have no window and rely on a small extractor fan that is often blocked with dust or not running at all. Steam then sits on a cold ceiling under the AC duct and ordinary emulsion goes mouldy within months. Painting over live mould is the usual shortcut, and it grows back through the new coat. The site visit checks the fan, looks for a leak from the floor above, tests soft or powdery plaster near the shower and confirms whether the ceiling is gypsum board or an access tile.
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey, colour and written scope. We measure, test the existing coating and agree colours, sheen and the number of coats. The written quotation names the paint system and the scope.
- Protection. Furniture is moved and wrapped, floors are covered edge to edge, and switches, handles and light fittings are masked or removed.
- Surface preparation. Walls are washed, flaking paint is scraped back, cracks are opened and filled, and everything is sanded flat. Damp or salt affected areas are treated before any paint goes on.
- Primer and finish coats. A sealer or primer suited to the substrate is followed by two finish coats. Wet film thickness is checked on every coat.
- Snagging and handover. We inspect in daylight with you, touch up, clean down and hand over a paint schedule listing brand, colour codes and batch numbers for future touch ups.
Talk to a supervisor about bathroom painting today.
Why choose The MELLS for bathroom painting
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Preparation | Paint rolled over cracks, dust and damp | Cracks filled, surfaces sanded and primed before the first coat |
| Handover | The job ends when the crew leaves | Wet film thickness checked on every coat and an adhesion test at handover |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every bathroom painting job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
Wet film thickness checked on every coat and an adhesion test at handover.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Bathroom Painting in Liva, Town Square: what we plan for
This is one of the mid rise apartment buildings around the Town Square park, with access through building management. Tower rules on permits, service lifts and working hours apply even to a short visit, and we arrange all three.
Handover paint in new townhouses is thin and marks easily, so a first repaint with a washable finish makes a visible difference. Settlement cracks at ceiling joints are opened, filled and taped before painting, and tenants moving out are returned to the original white for the handover inspection.
Townhouse streets are open to visitors with no gate pass. Apartment buildings need a work permit from building management and a service lift booking, and we arrange both.
What your quotation depends on
A quotation for bathroom painting in Liva, Town Square follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Wall and ceiling area and ceiling height
- Condition of the surface and how much repair is needed
- Paint system, sheen and number of coats
- Colour changes, feature finishes and access equipment
Related Painting Services services in Liva, Town Square
Each one has its own scope and method.
Villa Painting
Apartment Painting
Interior Painting
Exterior Painting
Wall Painting
Antifungal Wall Painting
Facade Painting
Fence Painting
Move Out Painting
Office Painting
Ceiling Painting
Wall Crack and Plaster Repair
Feature Walls
Decorative and Textured Finishes
Wood and Door Painting
Kitchen Cabinet Painting
Boundary Wall Painting
Metal Gate and Railing Painting
Nursery and Kids Room Painting
Bedroom Painting
Living Room Painting
Kitchen Painting
Majlis Painting
Staircase and Hallway Painting
Townhouse Painting
Penthouse Painting
Single Room Painting
Paint Touch up
Wall Putty and Skim Coating
Damp Wall Treatment
Venetian Plaster and Stucco
Limewash and Mineral Paint
Two Tone and Colour Block Walls
Paint Colour Consultation
Airless Spray Painting
Skirting and Trim Painting
Pergola and Timber Staining
Garage Floor Painting
Exterior Texture Coating
Paint Stripping and Removal
House Painting
Roof Painting
Paint Colour Matching
Water Damage Paint Repair
Mansion Painting
Studio Apartment Painting
Epoxy Flooring
Nearby in Town Square
Questions about bathroom painting in Liva, Town Square
What does bathroom painting include?
Bathroom ceilings and upper walls are washed with an antifungal solution, sealed and finished in a moisture resistant paint made for steam, with sealant lines and tiles masked off. The work includes mould killed and washed off before any paint is opened; flaking paint scraped back to a sound edge and feathered; stain blocking primer over water marks and old mould shadows.
How soon can the shower be used after painting?
Leave it until the next day at the earliest, and keep the extractor running. The paint is touch dry within a couple of hours, but steam on a soft film causes surfactant streaks, the brown sticky runs sometimes seen on new bathroom paint.
Why does mould keep returning on my bathroom ceiling?
Mould returns where moisture stays. Usually the extractor is weak, the door is kept shut after a shower, or cold air from the AC duct chills the ceiling. Paint with a fungicide slows it, but the fan and the ventilation need fixing too, and we tell you which applies.
How much does bathroom painting cost in Liva, Town Square?
We do not publish prices, because no two jobs are the same. The main factors: wall and ceiling area and ceiling height; condition of the surface and how much repair is needed. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides bathroom painting in Liva, Town Square?
The MELLS provides bathroom painting in Liva, Town Square, Dubai. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does bathroom painting take?
Usually one to three days, confirmed with the quotation.
How many coats do you apply?
A primer or sealer where the surface needs it, then two finish coats. Strong colour changes may need a third coat, which is stated in the quotation.
Which paint brands do you use?
We apply the paint system named in your quotation. Most clients choose premium washable emulsions from the major brands stocked in Dubai, and we are happy to work with paints specified by your designer.
How do you protect furniture and floors?
Furniture is moved to the centre of the room and wrapped. Floors are covered edge to edge, and fittings are masked or removed. The crew cleans down every day.
Do you arrange the building permit in Liva, Town Square?
Yes. Most buildings ask contractors for a work permit, trade licence, insurance and staff IDs, and a service lift booking. We submit all of it for you.
Do you cover every part of Town Square?
Yes. Our crews work in all the townhouse clusters and apartment buildings in Town Square, Monday to Saturday.
How do I choose a company for bathroom painting in Liva, Town Square?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (wet film thickness checked on every coat and an adhesion test at handover) and puts right any failed check free of charge within 48 hours.
Can you come to Liva, Town Square at short notice?
Yes. Crews travel from our Barsha Heights base, and urgent work in Dubai is attended within two hours between 08:00 and 19:00, Monday to Saturday.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
