Waterproofing
Waterproofing in The Valley by Emaar
Waterproofing in The Valley by The MELLS. A waterproofing company for villas, apartments and buildings, treating roofs, bathrooms, balconies, water tanks and pools once the leak is traced. Book a site visit and you receive a written quotation before any work begins.
- Quotation
- Written, after a visit
- Response
- 2 hours in Dubai
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Waterproofing at a glance
| Service | Waterproofing |
|---|---|
| Also searched as | Waterproofing company in The Valley, roof waterproofing in The Valley, leak repair in The Valley |
| Location | The Valley by Emaar, Dubai |
| Property types | Townhouses and villas |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Quoted per project, typically 2 to 3 days for a bathroom and 3 to 7 days for a villa roof, including curing and a flood test |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Two hours in Dubai for urgent work, planned work within 48 hours |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
Dubai roofs bake for most of the year and then take a sudden downpour, which is when cracked membranes and blocked outlets show themselves. We trace the leak before recommending anything, prepare the surface, apply the membrane system named in your quotation and flood test it before any tile or screed goes back.
- Leak tracing with moisture readings and flood or dye tests
- Removal of failed membrane, loose screed and blown tiles
- Crack, joint and drain outlet repairs
- Liquid applied and sheet membranes matched to the surface
- Upstands, corners and pipe penetrations detailed
- Flood test before finishes are reinstated
- Screed, tiling and regrouting over the new membrane
- Building or community paperwork prepared where approval is needed
- Photographs of every layer in the handover report
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Talk to a supervisor about waterproofing today.
Why choose The MELLS for waterproofing
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every waterproofing job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Waterproofing in The Valley: what we plan for
The Valley by Emaar is a townhouse and villa community on the Dubai Al Ain Road, past Arabian Ranches and Dubai Silicon Oasis. Clusters such as Eden, Talia, Nima, Orania, Alana, Rivana, Kaia, Farm Gardens and Velora sit around Golden Beach, a sports village, a town centre and green parks, and new phases continue to be handed over.
The community sits on the open desert, so fine sand reaches terraces, garages and window tracks after any windy day, and AC filters clog faster than in the city. Sand loads are high here, so AC filters and coils are worth checking every few months, with a full service before summer.
Clusters are gated. Contractor visits are registered by the resident, and exterior changes need community approval.
What your quotation depends on
A quotation for waterproofing in The Valley follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Waterproofing services in The Valley
Each one has its own scope and method.
Waterproofing across The Valley
Questions about waterproofing in The Valley
What does waterproofing include?
A waterproofing company for villas, apartments and buildings, treating roofs, bathrooms, balconies, water tanks and pools once the leak is traced. The work includes leak tracing with moisture readings and flood or dye tests; removal of failed membrane, loose screed and blown tiles; crack, joint and drain outlet repairs.
How much does waterproofing cost in The Valley?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides waterproofing in The Valley?
The MELLS provides waterproofing in The Valley, Dubai. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does waterproofing take?
Typically quoted per project, typically 2 to 3 days for a bathroom and 3 to 7 days for a villa roof, including curing and a flood test. The time for your property is confirmed with the quotation.
Can a bathroom be waterproofed without removing the tiles?
A clear sealer over tiles and grout can slow minor seepage, but it is not a membrane. Where water is reaching the room below, the tiles in the wet zone have to come up so the floor can be tanked properly.
How long does waterproofing last?
That depends on the membrane system, the exposure and how the surface is used. Your quotation names the system, and an exposed roof is worth inspecting before each summer.
The leak is coming from the apartment above. What can you do?
We inspect your ceiling, take readings and report the likely source with photographs. The repair itself has to be made in the unit above, so access is arranged through that owner or building management.
How do your crews get access to The Valley?
Clusters are gated. Contractor visits are registered by the resident, and exterior changes need community approval.
Do we need Emaar approval for work in The Valley?
Cleaning, AC servicing and repairs inside the home only need the gate or building pass, which the resident arranges. Exterior painting, waterproofing, fit out and any change to the facade, roof or garden structures need a no objection certificate from Emaar or the community management in The Valley before work starts. We prepare the method statement, drawings, insurance and trade licence documents the approval asks for.
How do I choose a company for waterproofing in The Valley?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
Can you come to The Valley at short notice?
Yes. Crews travel from our Barsha Heights base, and urgent work in Dubai is attended within two hours between 08:00 and 19:00, Monday to Saturday.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
