Waterproofing
Waterproofing in Dubai Islands
The MELLS provides waterproofing in Dubai Islands with its own directly employed team. A waterproofing company for villas, apartments and buildings, treating roofs, bathrooms, balconies, water tanks and pools once the leak is traced. We visit the property first and confirm the scope in a written quotation.
- Quotation
- Written, after a visit
- Response
- 2 hours in Dubai
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Waterproofing at a glance
| Service | Waterproofing |
|---|---|
| Also searched as | Waterproofing company in Dubai Islands, roof waterproofing in Dubai Islands, leak repair in Dubai Islands |
| Location | Dubai Islands |
| Property types | Villas and apartments |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Quoted per project, typically 2 to 3 days for a bathroom and 3 to 7 days for a villa roof, including curing and a flood test |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Two hours in Dubai for urgent work, planned work within 48 hours |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
Dubai roofs bake for most of the year and then take a sudden downpour, which is when cracked membranes and blocked outlets show themselves. We trace the leak before recommending anything, prepare the surface, apply the membrane system named in your quotation and flood test it before any tile or screed goes back.
- Leak tracing with moisture readings and flood or dye tests
- Removal of failed membrane, loose screed and blown tiles
- Crack, joint and drain outlet repairs
- Liquid applied and sheet membranes matched to the surface
- Upstands, corners and pipe penetrations detailed
- Flood test before finishes are reinstated
- Screed, tiling and regrouting over the new membrane
- Building or community paperwork prepared where approval is needed
- Photographs of every layer in the handover report
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Talk to a supervisor about waterproofing today.
Why choose The MELLS for waterproofing
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every waterproofing job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Waterproofing in Dubai Islands: what we plan for
Dubai Islands is Nakheel's group of islands off Dubai's northern coast, near the mouth of Dubai Creek, planned with beaches, marinas, hotels and residential neighbourhoods. Bay Villas brings beachfront, waterfront and garden villas with townhouses and semi detached homes, with handovers expected from 2027.
Open water on every side means salt on glass and outdoor metal, sand blown onto terraces, and high humidity in the warmer months, which makes mould in closed rooms a real risk. An early AC service clears construction dust from the coils, and a dehumidifying setting helps when a new home is left closed in summer.
Contractor access is arranged through the community and the building teams. Early on, the developer sets the dates for handover inspections.
What your quotation depends on
A quotation for waterproofing in Dubai Islands follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Waterproofing services in Dubai Islands
Each one has its own scope and method.
Waterproofing across Dubai Islands
Questions about waterproofing in Dubai Islands
What does waterproofing include?
A waterproofing company for villas, apartments and buildings, treating roofs, bathrooms, balconies, water tanks and pools once the leak is traced. The work includes leak tracing with moisture readings and flood or dye tests; removal of failed membrane, loose screed and blown tiles; crack, joint and drain outlet repairs.
How much does waterproofing cost in Dubai Islands?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides waterproofing in Dubai Islands?
The MELLS provides waterproofing in Dubai Islands. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does waterproofing take?
Typically quoted per project, typically 2 to 3 days for a bathroom and 3 to 7 days for a villa roof, including curing and a flood test. The time for your property is confirmed with the quotation.
Do you provide waterproofing in Dubai Islands?
Yes. We waterproof roofs, wet rooms, balconies, tanks and pools across Dubai. The first step is always a site visit to trace where the water is getting in.
How do you find where a leak is coming from?
We take moisture readings, inspect the area above and around the damp, and where needed run a flood or dye test on the suspect surface. The plumbing is pressure tested if a pipe is the likelier cause.
Can a bathroom be waterproofed without removing the tiles?
A clear sealer over tiles and grout can slow minor seepage, but it is not a membrane. Where water is reaching the room below, the tiles in the wet zone have to come up so the floor can be tanked properly.
How do your crews get access to Dubai Islands?
Contractor access is arranged through the community and the building teams. Early on, the developer sets the dates for handover inspections.
How do we stop mould while the villa is empty?
Leave the AC running at a warmer setting, keep wardrobes slightly open and book a check after a long closure. We treat any growth at the cause.
How do I choose a company for waterproofing in Dubai Islands?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
Can you come to Dubai Islands at short notice?
Yes. Crews travel from our Barsha Heights base, and urgent work in Dubai is attended within two hours between 08:00 and 19:00, Monday to Saturday.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
