Painting Services
House Painting in DAMAC Islands
The MELLS provides house painting in DAMAC Islands with its own directly employed team. House painting covers the inside or outside of a home: surfaces are washed, repaired, sanded and primed, then finished in two coats, room by room or face by face. We visit the property first and confirm the scope in a written quotation.
- Quotation
- Written, after a visit
- Response
- 2 hours in Dubai
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

House Painting at a glance
| Service | House Painting |
|---|---|
| Location | DAMAC Islands, Dubai |
| Property types | Townhouses and villas |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | 1 to 2 days for most apartments and 3 to 6 days for most villas |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | Wet film thickness checked on every coat and an adhesion test at handover |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Two hours in Dubai for urgent work, planned work within 48 hours |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
Interior and exterior painting by our own painters, with surfaces properly prepared, furniture fully protected and wet film thickness checked on every coat. A good paint finish is mostly preparation. Dubai walls move with heat, hairline cracks open at ceiling joints, and coastal air and irrigation mark exterior walls within a few seasons. We repair and prime before we paint, apply the system named in your quotation and leave the home clean enough to move straight back into.
- Scope agreed: rooms, ceilings, woodwork and exterior faces
- Furniture, floors and fittings protected before preparation
- Cracks, holes and stains repaired, sanded and primed
- Two finish coats applied and each area checked in daylight
How we carry out house painting
A house is painted in a set order so finished work is never spoiled by what follows. Inside, the crew takes one or two rooms at a time: contents moved and wrapped, floors sheeted, defects filled and sanded, repairs primed, ceilings rolled before walls and woodwork finished last. Outside, each face is washed, cracks are opened and filled, a primer goes on and two coats of exterior acrylic follow. Colours and sheens are listed on a schedule first, and each colour is tinted in one batch to avoid shade differences.
Homes in Dubai age from the outside in. West facing walls fade and chalk, sealant at window frames opens in the heat and the rooms behind them show cracks at the corners. Indoors, long AC hours leave grey marks around grilles and condensation stains near glazing. A repaint that skips the repairs looks tired again within a season. The site visit goes through every room and each elevation, lists the defects, checks for damp and old leak stains and confirms whether the family will stay in the house during the work.
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey, colour and written scope. We measure, test the existing coating and agree colours, sheen and the number of coats. The written quotation names the paint system and the scope.
- Protection. Furniture is moved and wrapped, floors are covered edge to edge, and switches, handles and light fittings are masked or removed.
- Surface preparation. Walls are washed, flaking paint is scraped back, cracks are opened and filled, and everything is sanded flat. Damp or salt affected areas are treated before any paint goes on.
- Primer and finish coats. A sealer or primer suited to the substrate is followed by two finish coats. Wet film thickness is checked on every coat.
- Snagging and handover. We inspect in daylight with you, touch up, clean down and hand over a paint schedule listing brand, colour codes and batch numbers for future touch ups.
Talk to a supervisor about house painting today.
Why choose The MELLS for house painting
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Preparation | Paint rolled over cracks, dust and damp | Cracks filled, surfaces sanded and primed before the first coat |
| Handover | The job ends when the crew leaves | Wet film thickness checked on every coat and an adhesion test at handover |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every house painting job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
Wet film thickness checked on every coat and an adhesion test at handover.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
House Painting in DAMAC Islands: what we plan for
DAMAC Islands is a villa and townhouse community in Dubailand, reached from Emirates Road near DAMAC Lagoons and DAMAC Hills. Its clusters are named after islands, Maldives, Bora Bora, Seychelles, Hawaii, Bali and Fiji, with a second phase that includes Bahamas, Bermuda, Tahiti and Barbados, around lagoons, beaches and waterfalls, with the first handovers expected around 2028.
Lagoons and water features raise the humidity around the homes, and the inland location brings fine dust after windy days. New phases will be under construction for some time. New homes are painted to the developer's specification. Upgrades are easiest before furniture arrives, and exteriors follow the community palette.
Clusters will be gated. Contractor visits are registered by the owner with community management.
What your quotation depends on
A quotation for house painting in DAMAC Islands follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Wall and ceiling area and ceiling height
- Condition of the surface and how much repair is needed
- Paint system, sheen and number of coats
- Colour changes, feature finishes and access equipment
Related Painting Services services in DAMAC Islands
Each one has its own scope and method.
Villa Painting
Interior Painting
Exterior Painting
Wall Painting
Antifungal Wall Painting
Facade Painting
Fence Painting
Move Out Painting
Office Painting
Ceiling Painting
Wall Crack and Plaster Repair
Feature Walls
Decorative and Textured Finishes
Wood and Door Painting
Kitchen Cabinet Painting
Boundary Wall Painting
Metal Gate and Railing Painting
Nursery and Kids Room Painting
Bedroom Painting
Living Room Painting
Bathroom Painting
Kitchen Painting
Majlis Painting
Staircase and Hallway Painting
Townhouse Painting
Single Room Painting
Paint Touch up
Wall Putty and Skim Coating
Damp Wall Treatment
Venetian Plaster and Stucco
Limewash and Mineral Paint
Two Tone and Colour Block Walls
Paint Colour Consultation
Airless Spray Painting
Skirting and Trim Painting
Pergola and Timber Staining
Garage Floor Painting
Exterior Texture Coating
Paint Stripping and Removal
Roof Painting
Paint Colour Matching
Water Damage Paint Repair
Mansion Painting
Epoxy Flooring
House Painting across DAMAC Islands
Questions about house painting in DAMAC Islands
What does house painting include?
House painting covers the inside or outside of a home: surfaces are washed, repaired, sanded and primed, then finished in two coats, room by room or face by face. The work includes scope agreed: rooms, ceilings, woodwork and exterior faces; furniture, floors and fittings protected before preparation; cracks, holes and stains repaired, sanded and primed.
Can we live in the house while it is being painted?
Most families do. The work is sequenced so that bedrooms are finished and returned first and the kitchen and one bathroom are always usable. Water based paints with little odour are used indoors, and the foreman agrees each morning which rooms are being worked on.
Should the inside or the outside be painted first?
When both are planned, the outside generally goes first, as washing and crack repairs can expose leaks around windows that would mark new interior paint. In the hottest months the order is sometimes reversed so the exterior is done when walls are cooler.
How much does house painting cost in DAMAC Islands?
We do not publish prices, because no two jobs are the same. The main factors: wall and ceiling area and ceiling height; condition of the surface and how much repair is needed. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides house painting in DAMAC Islands?
The MELLS provides house painting in DAMAC Islands, Dubai. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does house painting take?
Typically 1 to 2 days for most apartments and 3 to 6 days for most villas. The time for your property is confirmed with the quotation.
How many coats do you apply?
A primer or sealer where the surface needs it, then two finish coats. Strong colour changes may need a third coat, which is stated in the quotation.
Which paint brands do you use?
We apply the paint system named in your quotation. Most clients choose premium washable emulsions from the major brands stocked in Dubai, and we are happy to work with paints specified by your designer.
How do you protect furniture and floors?
Furniture is moved to the centre of the room and wrapped. Floors are covered edge to edge, and fittings are masked or removed. The crew cleans down every day.
How do your crews get access to DAMAC Islands?
Clusters will be gated. Contractor visits are registered by the owner with community management.
Can you inspect our DAMAC Islands townhouse at handover?
Yes. We walk the home with you, list and photograph every defect for the developer, and re inspect once the list has been fixed.
How do I choose a company for house painting in DAMAC Islands?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (wet film thickness checked on every coat and an adhesion test at handover) and puts right any failed check free of charge within 48 hours.
Can you come to DAMAC Islands at short notice?
Yes. Crews travel from our Barsha Heights base, and urgent work in Dubai is attended within two hours between 08:00 and 19:00, Monday to Saturday.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
