Flooring & Tiling
Flooring & Tiling in Town Square Dubai
Flooring & Tiling in Town Square by The MELLS. A flooring company for homes, offices and shops, covering tile, timber, vinyl, SPC, laminate and epoxy floors, plus regrouting and polishing. Book a site visit and you receive a written quotation before any work begins.
- Quotation
- Written, after a visit
- Response
- 2 hours in Dubai
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Flooring & Tiling at a glance
| Service | Flooring & Tiling |
|---|---|
| Also searched as | Flooring company in Town Square, tile fixing in Town Square, vinyl flooring in Town Square |
| Location | Town Square Dubai |
| Property types | Villas and apartments |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Quoted per project, typically 1 to 2 days per room for click flooring and 3 to 7 days for tiling, including curing |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Two hours in Dubai for urgent work, planned work within 48 hours |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
A floor is only as good as the surface beneath it. Slabs are often uneven, and moisture from a wet area or a ground floor slab will lift timber and vinyl within months. We test the subfloor for level and moisture, prepare it properly and leave expansion gaps sized for a home that swings between summer heat and constant AC.
- Subfloor level and moisture checks
- Removal of old flooring and adhesive
- Self levelling compound and primer
- Ceramic, porcelain and stone tile fixing
- Engineered timber, laminate and SPC click flooring
- Sheet vinyl and luxury vinyl tile
- Epoxy coatings for garages, stores and plant rooms
- Regrouting, grout restoration and tile polishing
- Skirtings, thresholds and door trimming
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Talk to a supervisor about flooring & tiling today.
Why choose The MELLS for flooring & tiling
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every flooring & tiling job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Flooring & Tiling in Town Square: what we plan for
Town Square is a large family community off Al Qudra Road, built by Nshama around a central park and Reel Cinemas square. Rows of townhouses such as Zahra, Hayat, Safi, Naseem, Noor and Sama sit beside mid rise apartment buildings including Zahra Breeze, Jenna, Warda, Rawda and UNA.
Open desert lies on two sides of the community, so wind carries fine sand into window tracks, balconies and AC filters. Many homes are still in their first years, and builder's dust, paint spots and silicone marks are often left behind from handover. AC units work hard this close to the desert, so filters and coils clog quickly. We clean them in the same visit and check the drain lines.
Townhouse streets are open to visitors with no gate pass. Apartment buildings need a work permit from building management and a service lift booking, and we arrange both.
What your quotation depends on
A quotation for flooring & tiling in Town Square follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Flooring & Tiling services in Town Square
Each one has its own scope and method.
Flooring & Tiling across Town Square
Show all 23
Questions about flooring & tiling in Town Square
What does flooring & tiling include?
A flooring company for homes, offices and shops, covering tile, timber, vinyl, SPC, laminate and epoxy floors, plus regrouting and polishing. The work includes subfloor level and moisture checks; removal of old flooring and adhesive; self levelling compound and primer.
How much does flooring & tiling cost in Town Square?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides flooring & tiling in Town Square?
The MELLS provides flooring & tiling in Town Square, Dubai. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does flooring & tiling take?
Typically quoted per project, typically 1 to 2 days per room for click flooring and 3 to 7 days for tiling, including curing. The time for your property is confirmed with the quotation.
Can you replace a few cracked or hollow tiles without redoing the floor?
Yes, where a matching tile is available. We lift the damaged tiles, clean out the bed, refix with the correct adhesive and regrout as close to the aged grout colour as we can.
Do I need permission from my building to change the floor?
Many apartment buildings ask for a work permit, and some set rules on acoustic underlay. We confirm the rules for your building at the site visit and prepare the permit paperwork it asks for.
Do you install flooring in Town Square?
Yes. Our own floor layers and tilers work in villas, apartments, offices and shops across Dubai, and the site visit includes a level and moisture check of the existing floor.
How do your crews get access to Town Square?
Townhouse streets are open to visitors with no gate pass. Apartment buildings need a work permit from building management and a service lift booking, and we arrange both.
Do you cover every part of Town Square?
Yes. Our crews work in all the townhouse clusters and apartment buildings in Town Square, Monday to Saturday.
How do I choose a company for flooring & tiling in Town Square?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
Can you come to Town Square at short notice?
Yes. Crews travel from our Barsha Heights base, and urgent work in Dubai is attended within two hours between 08:00 and 19:00, Monday to Saturday.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
