AC Ducting & Duct Installation
Kitchen Exhaust Ducting in Al Maryah Island
Kitchen exhaust ducting is a separate grease rated system: heavy steel duct from the hood to the discharge point, with access doors for cleaning and a fan sized to suit. The MELLS carries this out in Al Maryah Island with its own directly employed team and a named supervisor. A supervisor visits first, and the written quotation follows before any work begins.
- Quotation
- Written, after a visit
- Response
- By appointment
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Kitchen Exhaust Ducting at a glance
| Service | Kitchen Exhaust Ducting |
|---|---|
| Location | Al Maryah Island, Abu Dhabi |
| Property types | Apartments |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Agreed at the site visit and planned around your trading hours |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Visits in Abu Dhabi by appointment, Monday to Saturday |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
AC ducting sized, fabricated and installed for villas, apartments, offices, shops and restaurants, with joints sealed, ducts insulated and airflow balanced. A ducted AC is only as good as the ductwork hidden above the ceiling. Ducts that are too small are noisy and starve the far rooms, and in Abu Dhabi humidity any gap in the insulation sweats and drips onto the ceiling below. Our own technicians work out the airflow each room needs, then fabricate, hang, seal and insulate the ducts and balance the system before handover.
- Hood size and extract rate taken from the cooking equipment
- Duct made with liquid tight joints and laid to a slight fall
- Access doors fitted at bends and along straight runs
- Route and discharge point agreed with the building first
How we carry out kitchen exhaust ducting
The extract rate is worked out from the cooking equipment under the hood, and the duct and fan are sized from that. The duct is made from heavier steel than AC duct, with joints that are welded or sealed liquid tight so grease cannot seep out. It is hung with a slight fall back towards the hood or a drain point, and access doors are fitted at each change of direction so the inside can be reached for cleaning. Make up air is planned with it, or the kitchen pulls air from the dining room.
A kitchen extract built like an AC duct is a hazard: grease collects at every lapped joint, leaks onto the ceiling and cannot be cleaned out. With no access doors, the cleaning crew can only reach the first metre. The route through a tower or a mall and the point where the air is discharged need the consent of the building, and often of the landlord as well. That is identified at the site visit, and we prepare the drawings and paperwork they ask for.
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Talk to a supervisor about kitchen exhaust ducting today.
Why choose The MELLS for kitchen exhaust ducting
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every kitchen exhaust ducting job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Kitchen Exhaust Ducting in Al Maryah Island: what we plan for
Al Maryah Island is the city's financial district, home to the Abu Dhabi Global Market towers and The Galleria. Its homes are high end apartments and penthouses: the Four Seasons Private Residences and Rosewood Residences, both run alongside their hotels, and Al Maryah Vista.
Towers face the channel on most sides, so salt and humidity settle on balconies and glass. Heavy AC use in sealed apartments dries timber and leather, while condensation forms on cold surfaces near the outlets. Apartments run on chilled water through fan coil units. We clean the units and drain trays, check thermostats and flush lines that cause leaks or smells.
Branded residences coordinate every contractor through their management office, and other towers need a work permit and a service lift booking. We confirm the rules at the site visit and prepare the documents each building asks for.
What your quotation depends on
A quotation for kitchen exhaust ducting in Al Maryah Island follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Related AC Ducting & Duct Installation services in Al Maryah Island
Each one has its own scope and method.
AC Duct Installation
Duct Fabrication
Duct Replacement
Duct Repair and Sealing
Duct Insulation
Flexible Duct Installation
Grille and Diffuser Installation
Bathroom Exhaust Fan and Ducting
Fresh Air Ducting
Dryer Vent Ducting
Duct Modification for Fit Out
Pre Insulated Ducting
Galvanised Steel Ducting
Volume Dampers and Air Balancing
Duct Leak Detection
AC Duct Camera Inspection
Fresh Air Duct Cleaning
Dryer Vent Cleaning
Duct Acoustic Lining Replacement
Questions about kitchen exhaust ducting in Al Maryah Island
What does kitchen exhaust ducting include?
Kitchen exhaust ducting is a separate grease rated system: heavy steel duct from the hood to the discharge point, with access doors for cleaning and a fan sized to suit. The work includes hood size and extract rate taken from the cooking equipment; duct made with liquid tight joints and laid to a slight fall; access doors fitted at bends and along straight runs.
Can the kitchen exhaust be connected to the AC ducting?
No. Cooking fumes carry grease and heat, so the extract runs as its own system from hood to discharge with its own fan. It shares nothing with the supply and return ducts that cool the premises.
Where can the exhaust discharge?
That is decided with the building, not by us alone. Towers and malls usually provide a dedicated riser or a set discharge location, and villas have more options. We confirm the point and the route at the site visit before anything is fabricated.
How much does kitchen exhaust ducting cost in Al Maryah Island?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides kitchen exhaust ducting in Al Maryah Island?
The MELLS provides kitchen exhaust ducting in Al Maryah Island, Abu Dhabi. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does kitchen exhaust ducting take?
Typically agreed at the site visit and planned around your trading hours. The time for your property is confirmed with the quotation.
Why are some rooms colder than others?
The far rooms are usually short of air. The ducts may be undersized, a flexible duct may be crushed, or the branches may have no dampers. We measure the airflow at each outlet, correct the duct and balance the system.
Which is better, galvanised steel or pre insulated duct?
Both work well when they are installed properly. Steel is stronger and suits long main runs, plant rooms and exposed ducts. Pre insulated panel is lighter and suits homes with shallow voids. We recommend one after seeing the site.
Does the building need to agree to duct changes?
In towers and malls, changes to the ducts, fire dampers or fresh air system are coordinated with building management. What the building asks for is identified at the site visit, and we prepare the paperwork.
Do you arrange the building permit in Al Maryah Island?
Yes. Most buildings ask contractors for a work permit, trade licence, insurance and staff IDs, and a service lift booking. We submit all of it for you.
Do you clean apartments with very delicate finishes?
Yes. Every finish is checked and noted before work starts, and the supervisor agrees the products and method with you first.
How do I choose a company for kitchen exhaust ducting in Al Maryah Island?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
How are visits to Al Maryah Island arranged?
Visits in Abu Dhabi are booked by appointment between 08:00 and 19:00, Monday to Saturday. Call or send the form and we agree the earliest time a supervisor can come to you.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
