Al Quoz
AC for New Rooms and Extensions in Al Quoz 3, Dubai
The MELLS provides AC for new rooms and extensions in Al Quoz 3, Dubai with its own directly employed team. New rooms and extensions are cooled either by extending the existing ducted system, where it has capacity to spare, or by adding a separate split unit sized for the room. A supervisor visits first, and the written quotation follows before any work begins.
- Quotation
- Written, after a visit
- Response
- 2 hours in Dubai
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

AC for New Rooms and Extensions at a glance
| Service | AC for New Rooms and Extensions |
|---|---|
| Location | Al Quoz 3, Dubai |
| Property types | Villas |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Half a day for one split unit, longer for ducted systems |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Two hours in Dubai for urgent work, planned work within 48 hours |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
Supply and installation of split, ducted, cassette and multi split air conditioning for Dubai homes, offices and shops, sized to the room and tested at handover. Most cooling complaints in Dubai trace back to the day the unit was fitted: a pipe run too long or kinked, lines never vacuumed, a drain with no fall. Our own technicians check the room load and the power supply first, fit the unit to the manufacturer's instructions and record the temperatures on a test run. We fit a unit we supply or one you bought, and say so plainly if it is the wrong size for the room.
- Spare capacity of the existing unit and ducts measured
- Load of the new room worked out from glazing, roof and use
- Pipe, drain and cable routes fixed before the ceiling closes
- Airflow rebalanced in the old rooms after any duct extension
How we carry out AC for new rooms and extensions
There are two ways to cool an added room. The first is to branch a new duct from the existing system, which only works if the unit has capacity to spare and the main duct is large enough, so we measure airflow and temperatures before deciding. The second, and the more common, is a separate split unit with its own condenser. In both cases the pipes, drain and cable are run while the walls and ceiling are still open, and the builder is given the positions for the core hole, the access panel and the power point.
Extensions in Dubai are often glazed rooms, enclosed terraces or roof rooms, and these gain far more heat than the rest of the house. Tapping a duct into the nearest branch usually leaves the new room warm and takes air from the bedroom next to it. A lightweight roof without insulation adds heavily to the load. Consent for the extension itself is a matter for the owner and the builder. What the AC work needs from the community or the building is identified at the site visit.
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Talk to a supervisor about AC for new rooms and extensions today.
Why choose The MELLS for AC for new rooms and extensions
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every AC for new rooms and extensions job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
AC for New Rooms and Extensions in Al Quoz 3: what we plan for
This part of Al Quoz is residential, with private villas and older houses on open streets and a few low rise apartment buildings among them. We work room by room, protect the floors and furniture around the work area and leave the rest of the house undisturbed.
Rooftop package units and split condensers choke on coarse dust. Condenser coils are washed, filters changed or cleaned, belts and drains checked, and roof outlets cleared of the grit that washes into them.
Villas and most warehouses are on open streets with direct loading. The apartment communities run a permit and lift booking system, which The MELLS deals with. Galleries, managed warehouse compounds and working factories have their own site rules, confirmed at the site visit.
What your quotation depends on
A quotation for AC for new rooms and extensions in Al Quoz 3, Dubai follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Related AC Installation services in Al Quoz 3
Each one has its own scope and method.
Split AC Installation
Ducted AC Installation
Cassette AC Installation
Window AC Installation
Multi Split and VRF Installation
Rooftop Package Unit Installation
AC Replacement
AC Relocation
Outdoor Unit Installation and Relocation
AC Copper Piping and Insulation
AC Drain Line Installation
Smart Thermostat Installation
Villa AC Installation
Apartment AC Installation
Office AC Installation
Shop and Restaurant AC Installation
Server Room AC Installation
AC Removal and Disposal
AC Commissioning and Testing
AC Thermostat Replacement
AC Gas Refill
AC UV Light Installation
Air Curtain Installation and Repair
Nearby in Al Quoz
Questions about AC for new rooms and extensions in Al Quoz 3
What does AC for new rooms and extensions include?
New rooms and extensions are cooled either by extending the existing ducted system, where it has capacity to spare, or by adding a separate split unit sized for the room. The work includes spare capacity of the existing unit and ducts measured; load of the new room worked out from glazing, roof and use; pipe, drain and cable routes fixed before the ceiling closes.
Can my existing AC be extended to the new room?
Only if it has capacity to spare, and most systems were sized for the original rooms with little margin. We measure the airflow and the temperature drop across the coil. If the readings show no margin, a separate unit is the honest answer.
When should the AC installer be brought in on an extension?
Before the ceiling and the plaster go on. Pipes, drains and cables are far neater when they are run inside the structure at first fix, and the builder can then leave the core hole, the access panel and the power point in the right places.
How much does AC for new rooms and extensions cost in Al Quoz 3, Dubai?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides AC for new rooms and extensions in Al Quoz 3, Dubai?
The MELLS provides AC for new rooms and extensions in Al Quoz 3, Dubai. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does AC for new rooms and extensions take?
Typically half a day for one split unit, longer for ducted systems. The time for your property is confirmed with the quotation.
Do you install air conditioners in Al Quoz 3, Dubai?
Yes. Our own technicians install split, ducted, cassette and multi split systems across Dubai. A site visit comes first, to check the room, the power supply and where the outdoor unit can go, and the scope is then put in writing.
Can you install a unit I have already bought?
Yes. We fit units supplied by us or by you. If the one you have bought is the wrong size for the room we tell you before it goes on the wall. An oversized unit cools fast but leaves the air damp, and an undersized one runs all day without reaching the set temperature.
What size of air conditioner does my room need?
Capacity follows the heat the room gains, not only its floor area. Glazing that faces the afternoon sun, ceiling height, a roof directly above, the number of people and any kitchen or equipment all add load. We measure and work it out at the site visit.
How do your crews get access to Al Quoz 3, Dubai?
Villas and most warehouses are on open streets with direct loading. The apartment communities run a permit and lift booking system, which The MELLS deals with. Galleries, managed warehouse compounds and working factories have their own site rules, confirmed at the site visit.
Do you cover Al Khail Gate and Al Khail Heights?
Yes. Both are apartment communities with their own management. A compact team is sent, and the permit and the lift slot are requested before the visit.
How do I choose a company for AC for new rooms and extensions in Al Quoz 3, Dubai?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
Can you come to Al Quoz 3, Dubai at short notice?
Yes. Crews travel from our Barsha Heights base, and urgent work in Dubai is attended within two hours between 08:00 and 19:00, Monday to Saturday.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
