Al Mushrif
Rooftop Package Unit Installation in Al Yasat Compound, Al Mushrif
Rooftop package units hold the compressor, coils and fans in one casing on the villa roof, set on a plinth or steel frame and joined to the supply and return ducts below. The MELLS carries this out in Al Yasat Compound, Al Mushrif with its own directly employed team and a named supervisor. We visit the property first and confirm the scope in a written quotation.
- Quotation
- Written, after a visit
- Response
- By appointment
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Rooftop Package Unit Installation at a glance
| Service | Rooftop Package Unit Installation |
|---|---|
| Location | Al Yasat Compound, Al Mushrif, Abu Dhabi |
| Property types | Villas |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Half a day for one split unit, longer for ducted systems |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Visits in Abu Dhabi by appointment, Monday to Saturday |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
Supply and installation of split, ducted, cassette and multi split air conditioning for Abu Dhabi homes, offices and shops, sized to the room and tested at handover. Most cooling complaints in Abu Dhabi trace back to the day the unit was fitted: a pipe run too long or kinked, lines never vacuumed, a drain with no fall. Our own technicians check the room load and the power supply first, fit the unit to the manufacturer's instructions and record the temperatures on a test run. We fit a unit we supply or one you bought, and say so plainly if it is the wrong size for the room.
- Plinth and roof checked for the weight of the new unit
- Crane or hoist position and community access agreed in advance
- Duct connections made with flexible collars and sealed
- Condensate drain trapped and led to a roof outlet
How we carry out rooftop package unit installation
Many Abu Dhabi villas are cooled by package units on the roof, one for each floor or wing. The unit arrives complete and is lifted by crane or hoist onto a concrete plinth or a steel frame, with vibration pads beneath. Supply and return ducts connect through flexible collars so the fan does not shake the ductwork. The power cable and isolator are matched to the nameplate, the condensate drain is trapped and run to a roof outlet, and the unit is started with airflow, running current and air temperatures recorded.
A roof in full sun is the hardest place an air conditioner can work, and duct insulation up there breaks down in a few years if it is not clad. Leaking duct joints cool the roof instead of the bedrooms. A new unit seldom lines up with the old duct openings, so the roof sections are remade. In gated communities a crane on the street and a unit visible on the roof may need the master developer's consent, which we identify at the site visit along with the plinth condition and the supply.
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Talk to a supervisor about rooftop package unit installation today.
Why choose The MELLS for rooftop package unit installation
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every rooftop package unit installation job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Rooftop Package Unit Installation in Al Yasat Compound: what we plan for
A Mushrif villa compound of family homes with private gardens and maid's rooms, some sharing a community pool, courts and a play area. We work room by room, protect the floors and furniture around the work area and leave the rest of the house undisturbed.
A typical Mushrif villa has ducted and split AC units installed at different times, along with water tanks and pumps. We map the equipment first, clean ducts and coils, and check tanks for the sediment hard water leaves behind.
Standalone villas are reached directly, with the owner or house manager present for the first visit. Compounds such as Al Yasat and Palm Oasis have gate security, so the resident registers the crew in advance. Approvals for exterior work are identified at the site visit and we prepare the paperwork.
What your quotation depends on
A quotation for rooftop package unit installation in Al Yasat Compound, Al Mushrif follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Related AC Installation services in Al Yasat Compound
Each one has its own scope and method.
Split AC Installation
Ducted AC Installation
Cassette AC Installation
Window AC Installation
Multi Split and VRF Installation
AC Replacement
AC Relocation
Outdoor Unit Installation and Relocation
AC Copper Piping and Insulation
AC Drain Line Installation
Smart Thermostat Installation
Villa AC Installation
AC for New Rooms and Extensions
AC Removal and Disposal
AC Commissioning and Testing
AC Thermostat Replacement
AC Gas Refill
AC UV Light Installation
Nearby in Al Mushrif
Questions about rooftop package unit installation in Al Yasat Compound
What does rooftop package unit installation include?
Rooftop package units hold the compressor, coils and fans in one casing on the villa roof, set on a plinth or steel frame and joined to the supply and return ducts below. The work includes plinth and roof checked for the weight of the new unit; crane or hoist position and community access agreed in advance; duct connections made with flexible collars and sealed.
Can a package unit be replaced without changing the ducts?
The main ducts inside the villa normally stay. The short sections on the roof are remade to fit the new unit, and we inspect the existing duct for leaks and failed insulation while it is open, since a new unit on leaking duct will still cool poorly.
Is a crane always needed?
For most rooftop package units a crane is needed because of the weight, though some smaller units can go up by hoist. Where the crane stands, the road access and the time slot are arranged with the community once the site visit has shown what the lift involves.
How much does rooftop package unit installation cost in Al Yasat Compound, Al Mushrif?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides rooftop package unit installation in Al Yasat Compound, Al Mushrif?
The MELLS provides rooftop package unit installation in Al Yasat Compound, Al Mushrif, Abu Dhabi. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does rooftop package unit installation take?
Typically half a day for one split unit, longer for ducted systems. The time for your property is confirmed with the quotation.
Why do the lines have to be vacuumed?
Air and moisture left in the copper pipes mix with the refrigerant and the oil, which lowers cooling and wears the compressor early. A vacuum pump draws both out, and the gauge has to hold steady before the refrigerant is released into the lines.
Do you install air conditioners in Al Yasat Compound, Al Mushrif?
Yes. Our own technicians install split, ducted, cassette and multi split systems across Abu Dhabi. A site visit comes first, to check the room, the power supply and where the outdoor unit can go, and the scope is then put in writing.
Can you install a unit I have already bought?
Yes. We fit units supplied by us or by you. If the one you have bought is the wrong size for the room we tell you before it goes on the wall. An oversized unit cools fast but leaves the air damp, and an undersized one runs all day without reaching the set temperature.
How do your crews get access to Al Yasat Compound, Al Mushrif?
Standalone villas are reached directly, with the owner or house manager present for the first visit. Compounds such as Al Yasat and Palm Oasis have gate security, so the resident registers the crew in advance. Approvals for exterior work are identified at the site visit and we prepare the paperwork.
Do you work with house managers and household staff?
Yes. The supervisor agrees the plan with the house manager, works zone by zone and walks each area with them before the crew moves on.
How do I choose a company for rooftop package unit installation in Al Yasat Compound, Al Mushrif?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
How are visits to Al Yasat Compound, Al Mushrif arranged?
Visits in Abu Dhabi are booked by appointment between 08:00 and 19:00, Monday to Saturday. Call or send the form and we agree the earliest time a supervisor can come to you.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
