AC Installation
Multi Split and VRF Installation in Al Khalidiyah
Several indoor units are served by a single outdoor unit through branched copper pipework, each room on its own control, with pipe sizes and lengths set out before work starts. The MELLS carries this out in Al Khalidiyah with its own directly employed team and a named supervisor. A supervisor visits first, and the written quotation follows before any work begins.
- Quotation
- Written, after a visit
- Response
- By appointment
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Multi Split and VRF Installation at a glance
| Service | Multi Split and VRF Installation |
|---|---|
| Location | Al Khalidiyah, Abu Dhabi |
| Property types | Apartments |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Half a day for one split unit, longer for ducted systems |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Visits in Abu Dhabi by appointment, Monday to Saturday |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
Supply and installation of split, ducted, cassette and multi split air conditioning for Abu Dhabi homes, offices and shops, sized to the room and tested at handover. Most cooling complaints in Abu Dhabi trace back to the day the unit was fitted: a pipe run too long or kinked, lines never vacuumed, a drain with no fall. Our own technicians check the room load and the power supply first, fit the unit to the manufacturer's instructions and record the temperatures on a test run. We fit a unit we supply or one you bought, and say so plainly if it is the wrong size for the room.
- Pipe sizes, lengths and branch positions drawn before work starts
- Joints brazed with nitrogen flowing through the pipe
- Nitrogen pressure test held before the vacuum is pulled
- Extra refrigerant weighed in to suit the measured pipe length
How we carry out multi split and VRF installation
A multi split feeds a handful of indoor units from one condenser on separate pairs of pipes. A VRF system serves many more from a shared main with branch joints. In both, the pipe layout is designed first: sizes, lengths, height differences and where each branch sits. Joints are brazed with dry nitrogen flowing through so no scale forms inside. The network is pressure tested, left to stand, then vacuumed. Extra refrigerant is weighed in for the pipe length, and each indoor unit is tested from its controller.
These systems punish shortcuts. A branch joint fitted at the wrong angle starves one room of refrigerant, and scale from brazing without nitrogen blocks the fine expansion valves months later. The attraction in Abu Dhabi villas and offices is one outdoor unit where there is little wall or roof space for many. The site visit checks the total pipe length against the maker's limits, the power supply, which is often three phase, and where the outdoor unit can stand with clear airflow.
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Talk to a supervisor about multi split and VRF installation today.
Why choose The MELLS for multi split and VRF installation
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every multi split and VRF installation job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Multi Split and VRF Installation in Al Khalidiyah: what we plan for
Al Khalidiyah sits between the Corniche and the centre of Abu Dhabi island and is mostly apartment towers, from established mid rise blocks to taller buildings such as Shining Towers, Al Sawari Tower and Crescent Towers. In the middle of the district, Khalidiya Village is a gated community of villas and townhouses with its own clubhouse, pool and gym.
The district is dense and close to the sea, so humid air comes into apartments every time a balcony door opens. Traffic dust settles on window sills and in AC return grilles, and kitchens in smaller flats build up grease on extractor filters and wall tiles quickly. Many Khalidiya towers run on central chilled water with a fan coil unit in each room. We clean coils and filters, flush condensate drains and check thermostats, and anything that belongs to the building plant is reported to building management.
Every tower needs a work permit from building management and a service lift booking before a crew can start. Khalidiya Village has gated security, so the resident registers our team ahead of time. What each building asks for is identified at the site visit and we prepare the paperwork.
What your quotation depends on
A quotation for multi split and VRF installation in Al Khalidiyah follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Related AC Installation services in Al Khalidiyah
Each one has its own scope and method.
Split AC Installation
Ducted AC Installation
Cassette AC Installation
Window AC Installation
AC Replacement
AC Relocation
Outdoor Unit Installation and Relocation
AC Copper Piping and Insulation
AC Drain Line Installation
Smart Thermostat Installation
Apartment AC Installation
AC for New Rooms and Extensions
AC Removal and Disposal
AC Commissioning and Testing
AC Thermostat Replacement
AC Gas Refill
AC UV Light Installation
Multi Split and VRF Installation across Al Khalidiyah
Questions about multi split and VRF installation in Al Khalidiyah
What does multi split and VRF installation include?
Several indoor units are served by a single outdoor unit through branched copper pipework, each room on its own control, with pipe sizes and lengths set out before work starts. The work includes pipe sizes, lengths and branch positions drawn before work starts; joints brazed with nitrogen flowing through the pipe; nitrogen pressure test held before the vacuum is pulled.
What is the difference between multi split and VRF?
A multi split runs a separate pair of pipes from the outdoor unit to each indoor unit and suits a few rooms. VRF shares one set of main pipes with branches, serves many indoor units over longer distances and varies the refrigerant flow to match the load in each room.
Can each room be set to its own temperature?
Yes. Every indoor unit has its own controller and can be switched off while the others run. On most systems all rooms must be in the same mode, cooling or heating, which is rarely a limit in Abu Dhabi.
How much does multi split and VRF installation cost in Al Khalidiyah?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides multi split and VRF installation in Al Khalidiyah?
The MELLS provides multi split and VRF installation in Al Khalidiyah, Abu Dhabi. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does multi split and VRF installation take?
Typically half a day for one split unit, longer for ducted systems. The time for your property is confirmed with the quotation.
Do you install air conditioners in Al Khalidiyah?
Yes. Our own technicians install split, ducted, cassette and multi split systems across Abu Dhabi. A site visit comes first, to check the room, the power supply and where the outdoor unit can go, and the scope is then put in writing.
Can you install a unit I have already bought?
Yes. We fit units supplied by us or by you. If the one you have bought is the wrong size for the room we tell you before it goes on the wall. An oversized unit cools fast but leaves the air damp, and an undersized one runs all day without reaching the set temperature.
What size of air conditioner does my room need?
Capacity follows the heat the room gains, not only its floor area. Glazing that faces the afternoon sun, ceiling height, a roof directly above, the number of people and any kitchen or equipment all add load. We measure and work it out at the site visit.
Do you arrange the building permit in Al Khalidiyah?
Yes. Most buildings ask contractors for a work permit, trade licence, insurance and staff IDs, and a service lift booking. We submit all of it for you.
Do you work in Khalidiya Village as well as the towers?
Yes. Khalidiya Village homes are handled as house projects with gardens and pools in scope, while tower apartments are planned around the building permit and the lift booking.
How do I choose a company for multi split and VRF installation in Al Khalidiyah?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
How are visits to Al Khalidiyah arranged?
Visits in Abu Dhabi are booked by appointment between 08:00 and 19:00, Monday to Saturday. Call or send the form and we agree the earliest time a supervisor can come to you.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.