Al Khalidiyah
Outdoor Unit Installation and Relocation in Al Ain Tower, Al Khalidiyah
Outdoor Unit Installation and Relocation in Al Ain Tower, Al Khalidiyah by The MELLS. Outdoor units are fixed on a wall bracket, roof stand or ground pad with clear air around the coil, and moving one means a pump down and a remade pipe, cable and drain run. Book a site visit and you receive a written quotation before any work begins.
- Quotation
- Written, after a visit
- Response
- By appointment
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Outdoor Unit Installation and Relocation at a glance
| Service | Outdoor Unit Installation and Relocation |
|---|---|
| Location | Al Ain Tower, Al Khalidiyah, Abu Dhabi |
| Property types | Apartments |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Half a day for one split unit, longer for ducted systems |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Visits in Abu Dhabi by appointment, Monday to Saturday |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
Supply and installation of split, ducted, cassette and multi split air conditioning for Abu Dhabi homes, offices and shops, sized to the room and tested at handover. Most cooling complaints in Abu Dhabi trace back to the day the unit was fitted: a pipe run too long or kinked, lines never vacuumed, a drain with no fall. Our own technicians check the room load and the power supply first, fit the unit to the manufacturer's instructions and record the temperatures on a test run. We fit a unit we supply or one you bought, and say so plainly if it is the wrong size for the room.
- New position checked for airflow, shade and service access
- Bracket fixed into solid masonry with anchor bolts
- Rubber mounts fitted under the feet to cut vibration
- Pipe and cable run in one length wherever the route allows
How we carry out outdoor unit installation and relocation
The condenser needs free air into the coil and a clear path for the hot discharge. We fix a galvanised wall bracket into solid block or concrete with anchor bolts, or set the unit on a roof stand or a ground pad raised clear of irrigation water. Rubber mounts go under the feet. To move a unit, the refrigerant is pumped down, the pipes and cable are disconnected and capped, and the run is remade to the new position, ideally in one length with no added joints. A vacuum, a leak test and a test run follow.
A condenser pushed into a recess, a narrow side passage or a row of other units breathes hot air and loses capacity just when the afternoon is hottest. Direct afternoon sun on the coil does the same, so a shaded wall is preferred where there is one. In Abu Dhabi towers the building decides where outdoor units stand, and in gated communities a unit on an elevation or a roof may need the master developer's consent. Both are identified at the site visit, and we prepare the paperwork that is asked for.
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Talk to a supervisor about outdoor unit installation and relocation today.
Why choose The MELLS for outdoor unit installation and relocation
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every outdoor unit installation and relocation job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Outdoor Unit Installation and Relocation in Al Ain Tower: what we plan for
Established apartment buildings along Khalidiya's streets, many with shops or offices on the lower floors and a mix of older and newer interiors. In an apartment building we submit the work permit, book the service lift and bring compact equipment that fits it.
Many Khalidiya towers run on central chilled water with a fan coil unit in each room. We clean coils and filters, flush condensate drains and check thermostats, and anything that belongs to the building plant is reported to building management.
Every tower needs a work permit from building management and a service lift booking before a crew can start. Khalidiya Village has gated security, so the resident registers our team ahead of time. What each building asks for is identified at the site visit and we prepare the paperwork.
What your quotation depends on
A quotation for outdoor unit installation and relocation in Al Ain Tower, Al Khalidiyah follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Related AC Installation services in Al Ain Tower
Each one has its own scope and method.
Split AC Installation
Ducted AC Installation
Cassette AC Installation
Window AC Installation
Multi Split and VRF Installation
AC Replacement
AC Relocation
AC Copper Piping and Insulation
AC Drain Line Installation
Smart Thermostat Installation
Apartment AC Installation
AC for New Rooms and Extensions
AC Removal and Disposal
AC Commissioning and Testing
AC Thermostat Replacement
AC Gas Refill
AC UV Light Installation
Nearby in Al Khalidiyah
Questions about outdoor unit installation and relocation in Al Ain Tower
What does outdoor unit installation and relocation include?
Outdoor units are fixed on a wall bracket, roof stand or ground pad with clear air around the coil, and moving one means a pump down and a remade pipe, cable and drain run. The work includes new position checked for airflow, shade and service access; bracket fixed into solid masonry with anchor bolts; rubber mounts fitted under the feet to cut vibration.
Can the outdoor unit go on the roof?
Often, provided the pipe length and the height difference stay within what the maker allows and the roof is safe to reach for servicing. On a villa in a gated community the developer may have a say over what is visible, which we check before proposing it.
Why is my outdoor unit so noisy?
Common causes are a bracket fixed into hollow block, missing rubber mounts, a casing touching a railing or a fan blade out of balance. Moving the unit to a solid wall or a pad and isolating it properly removes most vibration noise.
How much does outdoor unit installation and relocation cost in Al Ain Tower, Al Khalidiyah?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides outdoor unit installation and relocation in Al Ain Tower, Al Khalidiyah?
The MELLS provides outdoor unit installation and relocation in Al Ain Tower, Al Khalidiyah, Abu Dhabi. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does outdoor unit installation and relocation take?
Typically half a day for one split unit, longer for ducted systems. The time for your property is confirmed with the quotation.
Why do the lines have to be vacuumed?
Air and moisture left in the copper pipes mix with the refrigerant and the oil, which lowers cooling and wears the compressor early. A vacuum pump draws both out, and the gauge has to hold steady before the refrigerant is released into the lines.
Do you install air conditioners in Al Ain Tower, Al Khalidiyah?
Yes. Our own technicians install split, ducted, cassette and multi split systems across Abu Dhabi. A site visit comes first, to check the room, the power supply and where the outdoor unit can go, and the scope is then put in writing.
Can you install a unit I have already bought?
Yes. We fit units supplied by us or by you. If the one you have bought is the wrong size for the room we tell you before it goes on the wall. An oversized unit cools fast but leaves the air damp, and an undersized one runs all day without reaching the set temperature.
Do you arrange the building permit in Al Ain Tower, Al Khalidiyah?
Yes. Most buildings ask contractors for a work permit, trade licence, insurance and staff IDs, and a service lift booking. We submit all of it for you.
Do you work in Khalidiya Village as well as the towers?
Yes. Khalidiya Village homes are handled as house projects with gardens and pools in scope, while tower apartments are planned around the building permit and the lift booking.
How do I choose a company for outdoor unit installation and relocation in Al Ain Tower, Al Khalidiyah?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
How are visits to Al Ain Tower, Al Khalidiyah arranged?
Visits in Abu Dhabi are booked by appointment between 08:00 and 19:00, Monday to Saturday. Call or send the form and we agree the earliest time a supervisor can come to you.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
