Waterproofing
Swimming Pool Waterproofing in Saadiyat Island
Swimming Pool Waterproofing in Saadiyat Island by The MELLS. For pools that lose more water than evaporation explains, we trace the loss, repair the finish and fittings, and waterproof before retiling. We visit the property first and confirm the scope in a written quotation.
- Quotation
- Written, after a visit
- Response
- By appointment
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Swimming Pool Waterproofing at a glance
| Service | Swimming Pool Waterproofing |
|---|---|
| Location | Saadiyat Island, Abu Dhabi |
| Property types | Villas and apartments |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Quoted per project, typically 2 to 3 days for a bathroom and 3 to 7 days for a villa roof, including curing and a flood test |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Visits in Abu Dhabi by appointment, Monday to Saturday |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
A waterproofing company for villas, apartments and buildings, treating roofs, bathrooms, balconies, water tanks and pools once the leak is traced. Abu Dhabi roofs bake for most of the year and then take a sudden downpour, which is when cracked membranes and blocked outlets show themselves. We trace the leak before recommending anything, prepare the surface, apply the membrane system named in your quotation and flood test it before any tile or screed goes back.
- Water loss test to separate a leak from evaporation
- Pool drained and failed tiles or plaster removed
- Hairline cracks, pipe entries and light niches sealed
- Flexible pool membrane applied before the new finish
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Talk to a supervisor about swimming pool waterproofing today.
Why choose The MELLS for swimming pool waterproofing
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every swimming pool waterproofing job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Swimming Pool Waterproofing in Saadiyat Island: what we plan for
Saadiyat Island mixes very different homes within a short drive. Saadiyat Beach Villas and Jawaher sit by the golf course, Saadiyat Lagoons and Saadiyat Reserve are newer villa communities further inland, and the beach side has apartment buildings such as Mamsha Al Saadiyat, Saadiyat Beach Residences and the St Regis Residences. Soho Square and Park View are apartment buildings near the Cultural District.
Along the north shore the wind brings salt and fine beach sand onto every terrace. Inland, golf and garden irrigation keeps humidity up around the villas, and open plots still being built on send dust across the newer communities on windy afternoons. Outdoor condensers near the beach corrode quickly, so coils are washed and fins checked at every visit. Villas also run pool pumps, booster pumps and water heaters that are logged and serviced on a schedule.
Saadiyat villa communities are gated, so the resident registers our crew with security first. Apartment buildings ask for a work permit and a service lift booking. Anything on the exterior needs the master community's approval; we identify this at the site visit and prepare the paperwork asked for.
What your quotation depends on
A quotation for swimming pool waterproofing in Saadiyat Island follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Related Waterproofing services in Saadiyat Island
Each one has its own scope and method.
Swimming Pool Waterproofing across Saadiyat Island
Questions about swimming pool waterproofing in Saadiyat Island
What does swimming pool waterproofing include?
For pools that lose more water than evaporation explains, we trace the loss, repair the finish and fittings, and waterproof before retiling. The work includes water loss test to separate a leak from evaporation; pool drained and failed tiles or plaster removed; hairline cracks, pipe entries and light niches sealed.
How much does swimming pool waterproofing cost in Saadiyat Island?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides swimming pool waterproofing in Saadiyat Island?
The MELLS provides swimming pool waterproofing in Saadiyat Island, Abu Dhabi. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does swimming pool waterproofing take?
Typically quoted per project, typically 2 to 3 days for a bathroom and 3 to 7 days for a villa roof, including curing and a flood test. The time for your property is confirmed with the quotation.
Do you provide waterproofing in Saadiyat Island?
Yes. We waterproof roofs, wet rooms, balconies, tanks and pools across Abu Dhabi. The first step is always a site visit to trace where the water is getting in.
How do you find where a leak is coming from?
We take moisture readings, inspect the area above and around the damp, and where needed run a flood or dye test on the suspect surface. The plumbing is pressure tested if a pipe is the likelier cause.
Can a bathroom be waterproofed without removing the tiles?
A clear sealer over tiles and grout can slow minor seepage, but it is not a membrane. Where water is reaching the room below, the tiles in the wet zone have to come up so the floor can be tanked properly.
How do your crews get access to Saadiyat Island?
Saadiyat villa communities are gated, so the resident registers our crew with security first. Apartment buildings ask for a work permit and a service lift booking. Anything on the exterior needs the master community's approval; we identify this at the site visit and prepare the paperwork asked for.
Do you cover the whole of Saadiyat Island?
Yes. We visit the beach side apartment buildings, the villa communities by the golf course and the newer communities inland. Visits are by appointment, Monday to Saturday, 08:00 to 19:00.
How do I choose a company for swimming pool waterproofing in Saadiyat Island?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
How are visits to Saadiyat Island arranged?
Visits in Abu Dhabi are booked by appointment between 08:00 and 19:00, Monday to Saturday. Call or send the form and we agree the earliest time a supervisor can come to you.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
