Al Raha Beach
Bathroom Waterproofing in Al Muneera Island, Al Raha Beach
Bathroom Waterproofing in Al Muneera Island, Al Raha Beach by The MELLS. Tanking of shower areas and bathroom floors beneath the tiles, the fix when water marks appear on the ceiling or wall of the room next door or below. Book a site visit and you receive a written quotation before any work begins.
- Quotation
- Written, after a visit
- Response
- By appointment
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Bathroom Waterproofing at a glance
| Service | Bathroom Waterproofing |
|---|---|
| Location | Al Muneera Island, Al Raha Beach, Abu Dhabi |
| Property types | Townhouses and villas |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Quoted per project, typically 2 to 3 days for a bathroom and 3 to 7 days for a villa roof, including curing and a flood test |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Visits in Abu Dhabi by appointment, Monday to Saturday |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
A waterproofing company for villas, apartments and buildings, treating roofs, bathrooms, balconies, water tanks and pools once the leak is traced. Abu Dhabi roofs bake for most of the year and then take a sudden downpour, which is when cracked membranes and blocked outlets show themselves. We trace the leak before recommending anything, prepare the surface, apply the membrane system named in your quotation and flood test it before any tile or screed goes back.
- Tiles and screed removed in the wet zone
- Membrane taken up the walls and into the drain
- Flood tested for at least 24 hours before tiling
- Retiled and grouted to match
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Talk to a supervisor about bathroom waterproofing today.
Why choose The MELLS for bathroom waterproofing
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every bathroom waterproofing job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Bathroom Waterproofing in Al Muneera Island: what we plan for
Al Muneera Island holds the townhouses and villas of the precinct, with terraces and gardens that face the water and take the salt directly. In a townhouse this is normally a short visit, and it can be combined with other work in the same booking.
Condensers on balconies and roofs corrode faster on this coast. Coils are washed, fins combed, drain lines flushed and electrical terminals checked for salt corrosion at every service.
Apartment buildings ask for a work permit from building management and a booked service lift. The island townhouses and Al Zeina villas sit behind security, where the resident registers our crew beforehand. Terrace or facade work may need master community consent, which is checked at the site visit.
What your quotation depends on
A quotation for bathroom waterproofing in Al Muneera Island, Al Raha Beach follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Related Waterproofing services in Al Muneera Island
Each one has its own scope and method.
Nearby in Al Raha Beach
Questions about bathroom waterproofing in Al Muneera Island
What does bathroom waterproofing include?
Tanking of shower areas and bathroom floors beneath the tiles, the fix when water marks appear on the ceiling or wall of the room next door or below. The work includes tiles and screed removed in the wet zone; membrane taken up the walls and into the drain; flood tested for at least 24 hours before tiling.
How much does bathroom waterproofing cost in Al Muneera Island, Al Raha Beach?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides bathroom waterproofing in Al Muneera Island, Al Raha Beach?
The MELLS provides bathroom waterproofing in Al Muneera Island, Al Raha Beach, Abu Dhabi. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does bathroom waterproofing take?
Typically quoted per project, typically 2 to 3 days for a bathroom and 3 to 7 days for a villa roof, including curing and a flood test. The time for your property is confirmed with the quotation.
Do you provide waterproofing in Al Muneera Island, Al Raha Beach?
Yes. We waterproof roofs, wet rooms, balconies, tanks and pools across Abu Dhabi. The first step is always a site visit to trace where the water is getting in.
How do you find where a leak is coming from?
We take moisture readings, inspect the area above and around the damp, and where needed run a flood or dye test on the suspect surface. The plumbing is pressure tested if a pipe is the likelier cause.
Can a bathroom be waterproofed without removing the tiles?
A clear sealer over tiles and grout can slow minor seepage, but it is not a membrane. Where water is reaching the room below, the tiles in the wet zone have to come up so the floor can be tanked properly.
How do your crews get access to Al Muneera Island, Al Raha Beach?
Apartment buildings ask for a work permit from building management and a booked service lift. The island townhouses and Al Zeina villas sit behind security, where the resident registers our crew beforehand. Terrace or facade work may need master community consent, which is checked at the site visit.
Can you work in the Al Bandar and Al Muneera apartment buildings?
Yes. We apply for the work permit through building management, book the service lift and protect the corridor. Visits in Abu Dhabi are by appointment, Monday to Saturday, 08:00 to 19:00.
How do I choose a company for bathroom waterproofing in Al Muneera Island, Al Raha Beach?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
How are visits to Al Muneera Island, Al Raha Beach arranged?
Visits in Abu Dhabi are booked by appointment between 08:00 and 19:00, Monday to Saturday. Call or send the form and we agree the earliest time a supervisor can come to you.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
