Masdar City
Defects Liability Inspection in Leonardo Residences, Masdar City
The MELLS provides defects liability inspection in Leonardo Residences, Masdar City with its own directly employed team. An inspection a month or two before the developer's defects liability period ends, catching cracks, leaks and faults that appeared after you moved in while they are still covered. We visit the property first and confirm the scope in a written quotation.
- Quotation
- Written, after a visit
- Response
- To your handover date
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Defects Liability Inspection at a glance
| Service | Defects Liability Inspection |
|---|---|
| Location | Leonardo Residences, Masdar City, Abu Dhabi |
| Property types | Apartments |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Half a day for an apartment, one full day for most villas, with the report within 48 hours |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Booked to the developer's inspection or handover date |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
Snagging and handover inspection for new villas, townhouses and apartments: every room checked before you accept the keys, every defect listed and photographed for the developer, and a re inspection once the list has been fixed. A new home is handed over with defects the eye misses in a short walk round: a door that binds, a hollow tile, a slow drain, a hairline crack, an AC that cools one room and not the next. Once the handover form is signed, getting them fixed is slower. The MELLS walks the home room by room with a written checklist, a moisture meter, a thermal camera and a spirit level, lists and photographs every defect, and sends a clear report you can hand to the developer. When the developer says the list is done, we come back and check each item again.
- Settlement cracks and movement joints checked
- Leaks, damp and mould checked with a moisture meter
- AC, water heaters and pumps checked after the first summer
- Report sent before the liability period ends
How we carry out defects liability inspection
A new home moves in its first year as it dries out and goes through a full summer of heat and AC. Hairline cracks appear at window corners and ceiling joints, sealant shrinks, tiles lift and small leaks show as stains. Most developers are responsible for these defects for a set period after handover.
Our inspector checks the home a month or two before that period ends and lists every defect with photographs, so you can claim them while the developer is still responsible.
How it works
The same method on every job, so the result does not depend on who is on shift.
- Booking against your handover date. You send the developer's inspection or handover date, and the inspection is planned for that slot, with the floor plan and specification if you have them.
- Room by room inspection. The inspector works through every room, the outside areas and the building services with a written checklist, a moisture meter, a thermal camera and a spirit level.
- Defects numbered and photographed. Each defect is numbered, located on the plan and photographed, so the developer's team can find it without guesswork.
- Report within 48 hours. The written report reaches you within 48 hours, in a format you can send straight to the developer.
- Re inspection. When the developer says the list is done, every item is checked again and anything still open is recorded in an updated report.
Talk to a supervisor about defects liability inspection today.
Why choose The MELLS for defects liability inspection
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every defects liability inspection job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Defects Liability Inspection in Leonardo Residences: what we plan for
Tower rules on permits, service lifts and working hours apply even to a short visit, and we arrange all three.
Filters and coils clog with fine desert dust faster here than on the coast, so AC servicing is planned more often, with drains and fan coil units checked at the same visit.
Residential buildings ask for a work permit and a lift booking through management, and townhomes in gated clusters need the resident to register our crew. These are confirmed at the site visit and we prepare the paperwork asked for.
What your quotation depends on
A quotation for defects liability inspection in Leonardo Residences, Masdar City follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Related Snagging & Handover Inspection services in Leonardo Residences
Each one has its own scope and method.
Nearby in Masdar City
Questions about defects liability inspection in Leonardo Residences
What does defects liability inspection include?
An inspection a month or two before the developer's defects liability period ends, catching cracks, leaks and faults that appeared after you moved in while they are still covered. The work includes settlement cracks and movement joints checked; leaks, damp and mould checked with a moisture meter; aC, water heaters and pumps checked after the first summer.
How long is the defects liability period?
It depends on the contract and the developer. Check your sales agreement and book the inspection a month or two before it ends.
Is it worth inspecting if everything looks fine?
Usually, yes. Small leaks and cracks show early, and they are far cheaper for you to have fixed while the developer is still responsible.
How much does defects liability inspection cost in Leonardo Residences, Masdar City?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides defects liability inspection in Leonardo Residences, Masdar City?
The MELLS provides defects liability inspection in Leonardo Residences, Masdar City, Abu Dhabi. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does defects liability inspection take?
Typically Half a day for an apartment, one full day for most villas, with the report within 48 hours. The time for your property is confirmed with the quotation.
Can you inspect before the defects liability period ends?
Yes. An inspection a month or two before the developer's liability period ends catches defects that appeared after you moved in, while they are still covered.
Can you clean the home after snagging?
Yes. Snagging, post handover deep cleaning and an AC clean are often booked together before furniture arrives.
When should I book a snagging inspection in Leonardo Residences, Masdar City?
As soon as the developer gives you the inspection or handover date. The inspection is done before you sign the handover form, so the defects are the developer's to fix.
Do you arrange the building permit in Leonardo Residences, Masdar City?
Yes. Most buildings ask contractors for a work permit, trade licence, insurance and staff IDs, and a service lift booking. We submit all of it for you.
Do you work in Oasis Residences and The Gate?
Yes. We arrange the building permit and lift booking with management, and visits are by appointment, Monday to Saturday, 08:00 to 19:00.
How do I choose a company for defects liability inspection in Leonardo Residences, Masdar City?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
How are visits to Leonardo Residences, Masdar City arranged?
Visits in Abu Dhabi are booked by appointment between 08:00 and 19:00, Monday to Saturday. Call or send the form and we agree the earliest time a supervisor can come to you.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
