Al Khalidiyah
Soundproof Partitions in United Square, Al Khalidiyah
The MELLS provides soundproof partitions in United Square, Al Khalidiyah with its own directly employed team. Partitions built to hold back sound use heavier or double board on each side of a steel stud frame, mineral wool in the cavity and sealed edges all round. A supervisor visits first, and the written quotation follows before any work begins.
- Quotation
- Written, after a visit
- Response
- By appointment
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Soundproof Partitions at a glance
| Service | Soundproof Partitions |
|---|---|
| Location | United Square, Al Khalidiyah, Abu Dhabi |
| Property types | Apartments |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Quoted per project, typically 1 to 2 days for a repair and 2 to 5 days for a new ceiling in one room |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Visits in Abu Dhabi by appointment, Monday to Saturday |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
False ceiling and gypsum works for homes, offices and shops: new ceilings, partitions, light coves, access panels and repairs after leaks. In Abu Dhabi the ceiling void carries the AC ducts, drain lines and wiring, so most ceiling damage starts with a leak or with a panel cut open for access. We find and stop the cause first, then frame, board, joint and paint so the repair blends with the ceiling around it.
- Frame bedded on acoustic sealant at the floor and the slab
- Mineral wool fitted tight between studs with no gaps
- Two layers of board each side with joints staggered
- Sockets offset and every perimeter gap sealed
How we carry out soundproof partitions
Sound is stopped by mass, by a cavity filled with absorbent material and by airtightness. So the track is bedded on a bead of acoustic sealant, studs go in, and mineral wool slabs are friction fitted between them from floor to head. Each side takes two layers of dense board, the second with its joints offset from the first. Where more is needed, the two faces are built on separate rows of studs so vibration cannot pass straight through. The perimeter is sealed and sockets on opposite faces are staggered.
Most partitions that disappoint stop at the false ceiling. Sound climbs over the top through the open void and comes down in the next room, and no amount of insulation in the wall will change that. The wall has to run to the slab, or the void needs a barrier above it. AC ducts shared between two rooms carry voices as well. A door with a gap beneath undoes the rest. The site visit looks above the ceiling, traces the ducts and asks what kind of noise is the problem, since speech and bass need different treatment.
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Talk to a supervisor about soundproof partitions today.
Why choose The MELLS for soundproof partitions
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every soundproof partitions job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Soundproof Partitions in United Square: what we plan for
Established apartment buildings along Khalidiya's streets, many with shops or offices on the lower floors and a mix of older and newer interiors. In an apartment building we submit the work permit, book the service lift and bring compact equipment that fits it.
Many Khalidiya towers run on central chilled water with a fan coil unit in each room. We clean coils and filters, flush condensate drains and check thermostats, and anything that belongs to the building plant is reported to building management.
Every tower needs a work permit from building management and a service lift booking before a crew can start. Khalidiya Village has gated security, so the resident registers our team ahead of time. What each building asks for is identified at the site visit and we prepare the paperwork.
What your quotation depends on
A quotation for soundproof partitions in United Square, Al Khalidiyah follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Related Gypsum & False Ceiling Works services in United Square
Each one has its own scope and method.
Gypsum Ceilings
Gypsum Partitions
False Ceiling Installation
False Ceiling Repair
Kitchen Ceiling Repair
Bathroom Ceiling Repair
Ceiling Water Damage Repair
Cove and Bulkhead Ceilings
Acoustic Ceilings
Ceiling Access Panels
Gypsum Cornices and Mouldings
Suspended Tile Ceilings
Ceiling Tile Replacement
Stretch Ceilings
Wooden and Slatted Ceilings
Metal and Aluminium Ceilings
Moisture Resistant Ceilings
Fire Rated Ceilings and Partitions
Coffered and Tray Ceilings
Ceiling Crack Repair
Sagging Ceiling Repair
Ceiling Mould Treatment
Ceiling Light and AC Openings
Gypsum Curtain Pelmets
Gypsum TV Walls and Niches
Gypsum Arches and Columns
Gypsum Wall Repair and Patching
Ceiling Insulation
Ceiling Removal and Strip Out
Nearby in Al Khalidiyah
Questions about soundproof partitions in United Square
What does soundproof partitions include?
Partitions built to hold back sound use heavier or double board on each side of a steel stud frame, mineral wool in the cavity and sealed edges all round. The work includes frame bedded on acoustic sealant at the floor and the slab; mineral wool fitted tight between studs with no gaps; two layers of board each side with joints staggered.
Will a soundproof partition block all noise?
No wall blocks everything. A well built double layer partition taken up to the slab makes normal speech next door hard to follow and takes the edge off television sound. Deep bass and impact noise travel through the floor and structure and need more than a partition.
Can an existing wall be upgraded?
Often, yes. A second layer of dense board can be added to one face, or a separate lining frame with mineral wool is built a small distance off the wall. The second option does more and takes a few centimetres from the room. Gaps at the ceiling are dealt with at the same time.
How much does soundproof partitions cost in United Square, Al Khalidiyah?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides soundproof partitions in United Square, Al Khalidiyah?
The MELLS provides soundproof partitions in United Square, Al Khalidiyah, Abu Dhabi. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does soundproof partitions take?
Typically quoted per project, typically 1 to 2 days for a repair and 2 to 5 days for a new ceiling in one room. The time for your property is confirmed with the quotation.
Can you repair one section, or does the whole ceiling need replacing?
Most damage is repaired locally. We cut back to sound board, fix new board to the frame, tape and skim the joints, then repaint the whole ceiling face so the finish is even.
Do I need approval to change a ceiling?
Some buildings and communities ask for a work permit, particularly where sprinklers, smoke detectors or AC grilles sit in the ceiling. This is checked at the site visit, and we prepare whatever documents they request.
How soon can a new ceiling be painted?
Jointing compound has to dry fully, usually overnight between coats in an air conditioned room. Painting follows once the joints are sanded flat and primed.
Do you arrange the building permit in United Square, Al Khalidiyah?
Yes. Most buildings ask contractors for a work permit, trade licence, insurance and staff IDs, and a service lift booking. We submit all of it for you.
Do you work in Khalidiya Village as well as the towers?
Yes. Khalidiya Village homes are handled as house projects with gardens and pools in scope, while tower apartments are planned around the building permit and the lift booking.
How do I choose a company for soundproof partitions in United Square, Al Khalidiyah?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
How are visits to United Square, Al Khalidiyah arranged?
Visits in Abu Dhabi are booked by appointment between 08:00 and 19:00, Monday to Saturday. Call or send the form and we agree the earliest time a supervisor can come to you.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
