Al Khalidiyah
Ceiling Removal and Strip Out in Al Sawari Tower, Al Khalidiyah
The MELLS provides ceiling removal and strip out in Al Sawari Tower, Al Khalidiyah with its own directly employed team. Old gypsum or tile ceilings are taken down in a controlled order, with lights, grilles and detectors disconnected first and the slab left clean for the next trade. A supervisor visits first, and the written quotation follows before any work begins.
- Quotation
- Written, after a visit
- Response
- By appointment
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Ceiling Removal and Strip Out at a glance
| Service | Ceiling Removal and Strip Out |
|---|---|
| Location | Al Sawari Tower, Al Khalidiyah, Abu Dhabi |
| Property types | Apartments |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Quoted per project, typically 1 to 2 days for a repair and 2 to 5 days for a new ceiling in one room |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Visits in Abu Dhabi by appointment, Monday to Saturday |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
False ceiling and gypsum works for homes, offices and shops: new ceilings, partitions, light coves, access panels and repairs after leaks. In Abu Dhabi the ceiling void carries the AC ducts, drain lines and wiring, so most ceiling damage starts with a leak or with a panel cut open for access. We find and stop the cause first, then frame, board, joint and paint so the repair blends with the ceiling around it.
- Circuits isolated and fittings removed by our electricians
- Floors, joinery and doorways protected and screened
- Board cut into manageable sections and lowered, not dropped
- Frame, hangers and anchors removed and debris cleared
How we carry out ceiling removal and strip out
Strip out starts with the services, not the board. Light circuits are isolated and fittings taken down, AC grilles and flexible ducts are disconnected and capped, and anything staying live is tagged. Floors are covered and the room is sealed with plastic sheeting. Board is then scored into sections and lowered by hand, since a whole sheet pulled down brings a cloud of dust and whatever is lying on top of it. The steel frame is unscrewed, hangers are cut and anchors taken out of the slab.
The top of an old ceiling in Abu Dhabi holds years of fine sand and dust drawn into the void, plus rubble from earlier trades, and it all comes down with the board. Without screens it spreads through the property and into the AC returns. Hidden hazards are the other concern: live cables resting on the board, a drain line supported by the frame, sprinkler pipes close above. In a tower the strip out is coordinated with building management, and the site visit identifies permits, waste routes and what must stay in place.
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Talk to a supervisor about ceiling removal and strip out today.
Why choose The MELLS for ceiling removal and strip out
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every ceiling removal and strip out job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Ceiling Removal and Strip Out in Al Sawari Tower: what we plan for
Taller residential towers in Khalidiya with large glazed facades, podium parking and shared pools and gyms for residents. Tower rules on permits, service lifts and working hours apply even to a short visit, and we arrange all three.
Many Khalidiya towers run on central chilled water with a fan coil unit in each room. We clean coils and filters, flush condensate drains and check thermostats, and anything that belongs to the building plant is reported to building management.
Every tower needs a work permit from building management and a service lift booking before a crew can start. Khalidiya Village has gated security, so the resident registers our team ahead of time. What each building asks for is identified at the site visit and we prepare the paperwork.
What your quotation depends on
A quotation for ceiling removal and strip out in Al Sawari Tower, Al Khalidiyah follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Related Gypsum & False Ceiling Works services in Al Sawari Tower
Each one has its own scope and method.
Gypsum Ceilings
Gypsum Partitions
False Ceiling Installation
False Ceiling Repair
Kitchen Ceiling Repair
Bathroom Ceiling Repair
Ceiling Water Damage Repair
Cove and Bulkhead Ceilings
Acoustic Ceilings
Ceiling Access Panels
Gypsum Cornices and Mouldings
Suspended Tile Ceilings
Ceiling Tile Replacement
Stretch Ceilings
Wooden and Slatted Ceilings
Metal and Aluminium Ceilings
Moisture Resistant Ceilings
Fire Rated Ceilings and Partitions
Coffered and Tray Ceilings
Ceiling Crack Repair
Sagging Ceiling Repair
Ceiling Mould Treatment
Ceiling Light and AC Openings
Gypsum Curtain Pelmets
Gypsum TV Walls and Niches
Gypsum Arches and Columns
Gypsum Wall Repair and Patching
Soundproof Partitions
Ceiling Insulation
Nearby in Al Khalidiyah
Questions about ceiling removal and strip out in Al Sawari Tower
What does ceiling removal and strip out include?
Old gypsum or tile ceilings are taken down in a controlled order, with lights, grilles and detectors disconnected first and the slab left clean for the next trade. The work includes circuits isolated and fittings removed by our electricians; floors, joinery and doorways protected and screened; board cut into manageable sections and lowered, not dropped.
Can the AC and sprinklers stay in while the ceiling comes down?
The AC units, ducts and sprinkler pipes hang from the slab and normally stay. Grilles, diffusers and light fittings are fixed to the ceiling itself, so they come out and are stored or disposed of as you instruct. Cables are made safe and left coiled for reuse.
How is the dust controlled?
The room is sealed with plastic sheeting and taped doorways, AC returns in the area are covered, and board is lowered in pieces instead of being pulled down. A vacuum with a fine filter runs during the work, and the slab, walls and floor are vacuumed before the screens come down.
How much does ceiling removal and strip out cost in Al Sawari Tower, Al Khalidiyah?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides ceiling removal and strip out in Al Sawari Tower, Al Khalidiyah?
The MELLS provides ceiling removal and strip out in Al Sawari Tower, Al Khalidiyah, Abu Dhabi. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does ceiling removal and strip out take?
Typically quoted per project, typically 1 to 2 days for a repair and 2 to 5 days for a new ceiling in one room. The time for your property is confirmed with the quotation.
Do you carry out false ceiling work in Al Sawari Tower, Al Khalidiyah?
Yes. Our ceiling team covers all of Abu Dhabi. At the site visit we measure the room, look above the existing ceiling where we can and check what your building or community requires before work starts.
Why has my ceiling stained or started to sag?
Almost always water: a blocked AC drain line, a leaking pipe or a bathroom above. Gypsum board softens when wet, so we trace and stop the source before any board is replaced.
Can you repair one section, or does the whole ceiling need replacing?
Most damage is repaired locally. We cut back to sound board, fix new board to the frame, tape and skim the joints, then repaint the whole ceiling face so the finish is even.
Do you arrange the building permit in Al Sawari Tower, Al Khalidiyah?
Yes. Most buildings ask contractors for a work permit, trade licence, insurance and staff IDs, and a service lift booking. We submit all of it for you.
Do you work in Khalidiya Village as well as the towers?
Yes. Khalidiya Village homes are handled as house projects with gardens and pools in scope, while tower apartments are planned around the building permit and the lift booking.
How do I choose a company for ceiling removal and strip out in Al Sawari Tower, Al Khalidiyah?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
How are visits to Al Sawari Tower, Al Khalidiyah arranged?
Visits in Abu Dhabi are booked by appointment between 08:00 and 19:00, Monday to Saturday. Call or send the form and we agree the earliest time a supervisor can come to you.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
