Gypsum & False Ceiling Works
Soundproof Partitions in Al Furjan, Discovery Gardens & Jebel Ali Village
The MELLS provides soundproof partitions in Al Furjan with its own directly employed team. Partitions built to hold back sound use heavier or double board on each side of a steel stud frame, mineral wool in the cavity and sealed edges all round. We visit the property first and confirm the scope in a written quotation.
- Quotation
- Written, after a visit
- Response
- 2 hours in Dubai
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Soundproof Partitions at a glance
| Service | Soundproof Partitions |
|---|---|
| Location | Al Furjan, Discovery Gardens & Jebel Ali Village, Dubai |
| Property types | Villas and apartments |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Quoted per project, typically 1 to 2 days for a repair and 2 to 5 days for a new ceiling in one room |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Two hours in Dubai for urgent work, planned work within 48 hours |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
False ceiling and gypsum works for homes, offices and shops: new ceilings, partitions, light coves, access panels and repairs after leaks. In Dubai the ceiling void carries the AC ducts, drain lines and wiring, so most ceiling damage starts with a leak or with a panel cut open for access. We find and stop the cause first, then frame, board, joint and paint so the repair blends with the ceiling around it.
- Frame bedded on acoustic sealant at the floor and the slab
- Mineral wool fitted tight between studs with no gaps
- Two layers of board each side with joints staggered
- Sockets offset and every perimeter gap sealed
How we carry out soundproof partitions
Sound is stopped by mass, by a cavity filled with absorbent material and by airtightness. So the track is bedded on a bead of acoustic sealant, studs go in, and mineral wool slabs are friction fitted between them from floor to head. Each side takes two layers of dense board, the second with its joints offset from the first. Where more is needed, the two faces are built on separate rows of studs so vibration cannot pass straight through. The perimeter is sealed and sockets on opposite faces are staggered.
Most partitions that disappoint stop at the false ceiling. Sound climbs over the top through the open void and comes down in the next room, and no amount of insulation in the wall will change that. The wall has to run to the slab, or the void needs a barrier above it. AC ducts shared between two rooms carry voices as well. A door with a gap beneath undoes the rest. The site visit looks above the ceiling, traces the ducts and asks what kind of noise is the problem, since speech and bass need different treatment.
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Talk to a supervisor about soundproof partitions today.
Why choose The MELLS for soundproof partitions
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every soundproof partitions job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Soundproof Partitions in Al Furjan: what we plan for
Al Furjan is a newer community of villas and townhouses, among them Quortaj and the Dubai Style Villas, with a growing band of apartment buildings such as Masakin Al Furjan, Murano Residences and the Azizi and Candace blocks. Discovery Gardens next door is older and lower: garden apartment buildings grouped into themed clusters, including Zen, Mogul, Mediterranean and Cactus. The Gardens is a similar low rise apartment quarter, and Jebel Ali Village is a villa district.
Apartment plots are still being built across Al Furjan, so cement dust settles on balconies and in AC filters. In Discovery Gardens the cause is different. Mature trees and daily irrigation bring leaf litter, insects and damp shade to the lower floors, and older window seals let fine dust through. AC units in the older apartments often have blocked drain lines that stain the ceiling below. The line is flushed, the tray cleaned and the coil washed. Villa systems in Al Furjan are serviced zone by zone in one visit.
Villa streets in Al Furjan have parking outside the house. Apartment buildings ask for a work permit and a service lift booking, which The MELLS arranges. In Discovery Gardens the blocks are low and the lifts small, so compact equipment is sent.
What your quotation depends on
A quotation for soundproof partitions in Al Furjan follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Related Gypsum & False Ceiling Works services in Al Furjan
Each one has its own scope and method.
Gypsum Ceilings
Gypsum Partitions
False Ceiling Installation
False Ceiling Repair
Kitchen Ceiling Repair
Bathroom Ceiling Repair
Ceiling Water Damage Repair
Cove and Bulkhead Ceilings
Acoustic Ceilings
Ceiling Access Panels
Gypsum Cornices and Mouldings
Suspended Tile Ceilings
Ceiling Tile Replacement
Stretch Ceilings
Wooden and Slatted Ceilings
Metal and Aluminium Ceilings
Moisture Resistant Ceilings
Fire Rated Ceilings and Partitions
Coffered and Tray Ceilings
Ceiling Crack Repair
Sagging Ceiling Repair
Ceiling Mould Treatment
Ceiling Light and AC Openings
Gypsum Curtain Pelmets
Gypsum TV Walls and Niches
Gypsum Arches and Columns
Gypsum Wall Repair and Patching
Ceiling Insulation
Villa False Ceilings
Majlis Ceilings
Office False Ceilings
Shop and Restaurant Ceilings
Ceiling Removal and Strip Out
Soundproof Partitions across Al Furjan
Questions about soundproof partitions in Al Furjan
What does soundproof partitions include?
Partitions built to hold back sound use heavier or double board on each side of a steel stud frame, mineral wool in the cavity and sealed edges all round. The work includes frame bedded on acoustic sealant at the floor and the slab; mineral wool fitted tight between studs with no gaps; two layers of board each side with joints staggered.
Will a soundproof partition block all noise?
No wall blocks everything. A well built double layer partition taken up to the slab makes normal speech next door hard to follow and takes the edge off television sound. Deep bass and impact noise travel through the floor and structure and need more than a partition.
Can an existing wall be upgraded?
Often, yes. A second layer of dense board can be added to one face, or a separate lining frame with mineral wool is built a small distance off the wall. The second option does more and takes a few centimetres from the room. Gaps at the ceiling are dealt with at the same time.
How much does soundproof partitions cost in Al Furjan?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides soundproof partitions in Al Furjan?
The MELLS provides soundproof partitions in Al Furjan, Dubai. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does soundproof partitions take?
Typically quoted per project, typically 1 to 2 days for a repair and 2 to 5 days for a new ceiling in one room. The time for your property is confirmed with the quotation.
Can you repair one section, or does the whole ceiling need replacing?
Most damage is repaired locally. We cut back to sound board, fix new board to the frame, tape and skim the joints, then repaint the whole ceiling face so the finish is even.
Do I need approval to change a ceiling?
Some buildings and communities ask for a work permit, particularly where sprinklers, smoke detectors or AC grilles sit in the ceiling. This is checked at the site visit, and we prepare whatever documents they request.
How soon can a new ceiling be painted?
Jointing compound has to dry fully, usually overnight between coats in an air conditioned room. Painting follows once the joints are sanded flat and primed.
How do your crews get access to Al Furjan?
Villa streets in Al Furjan have parking outside the house. Apartment buildings ask for a work permit and a service lift booking, which The MELLS arranges. In Discovery Gardens the blocks are low and the lifts small, so compact equipment is sent.
Do we need Nakheel approval for work in Al Furjan?
Cleaning, AC servicing and repairs inside the home only need the gate or building pass, which the resident arranges. Exterior painting, waterproofing, fit out and any change to the facade, roof or garden structures need a no objection certificate from Nakheel or the community management in Al Furjan before work starts. We prepare the method statement, drawings, insurance and trade licence documents the approval asks for.
How do I choose a company for soundproof partitions in Al Furjan?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
Can you come to Al Furjan at short notice?
Yes. Crews travel from our Barsha Heights base, and urgent work in Dubai is attended within two hours between 08:00 and 19:00, Monday to Saturday.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
