Sheikh Zayed Road
Epoxy Flooring in Trade Centre 2, Dubai
The MELLS provides epoxy flooring in Trade Centre 2, Dubai with its own directly employed team. Seamless resin coating for garages, stores, plant rooms and commercial kitchens, applied over a mechanically prepared and primed concrete slab. We visit the property first and confirm the scope in a written quotation.
- Quotation
- Written, after a visit
- Response
- 2 hours in Dubai
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Epoxy Flooring at a glance
| Service | Epoxy Flooring |
|---|---|
| Location | Trade Centre 2, Dubai |
| Property types | Apartments |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Quoted per project, typically 1 to 2 days per room for click flooring and 3 to 7 days for tiling, including curing |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Two hours in Dubai for urgent work, planned work within 48 hours |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
A flooring company for homes, offices and shops, covering tile, timber, vinyl, SPC, laminate and epoxy floors, plus regrouting and polishing. A floor is only as good as the surface beneath it. Slabs are often uneven, and moisture from a wet area or a ground floor slab will lift timber and vinyl within months. We test the subfloor for level and moisture, prepare it properly and leave expansion gaps sized for a home that swings between summer heat and constant AC.
- Slab diamond ground and cracks filled
- Moisture check before priming
- Coloured, flake or non slip finish
- Line marking and coved skirtings on request
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Talk to a supervisor about epoxy flooring today.
Why choose The MELLS for epoxy flooring
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every epoxy flooring job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Epoxy Flooring in Trade Centre 2: what we plan for
This is part of the Trade Centre business quarter, where offices, hotels and residences share large managed buildings with strict contractor rules. Tower rules on permits, service lifts and working hours apply even to a short visit, and we arrange all three.
Fresh air intakes and filters load quickly beside the road. Fan coil units and older ducted systems have filters, coils, trays and drain lines cleaned, and a ceiling stain is traced to the leaking drain before any repainting.
Every tower has a management office that issues work permits, checks staff details and books the service lift. The MELLS submits those requests. Loading is from the service road behind the towers, never from Sheikh Zayed Road itself. Villas in Zabeel and Al Satwa are on open streets.
What your quotation depends on
A quotation for epoxy flooring in Trade Centre 2, Dubai follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Related Flooring & Tiling services in Trade Centre 2
Each one has its own scope and method.
Nearby in Sheikh Zayed Road
Questions about epoxy flooring in Trade Centre 2
What does epoxy flooring include?
Seamless resin coating for garages, stores, plant rooms and commercial kitchens, applied over a mechanically prepared and primed concrete slab. The work includes slab diamond ground and cracks filled; moisture check before priming; coloured, flake or non slip finish.
How much does epoxy flooring cost in Trade Centre 2, Dubai?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides epoxy flooring in Trade Centre 2, Dubai?
The MELLS provides epoxy flooring in Trade Centre 2, Dubai. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does epoxy flooring take?
Typically quoted per project, typically 1 to 2 days per room for click flooring and 3 to 7 days for tiling, including curing. The time for your property is confirmed with the quotation.
Can new flooring go over my existing tiles?
Often, yes. SPC, laminate and vinyl can be laid over sound, level tiles once the grout lines are filled. We check door clearances and thresholds first, because the floor height rises.
Which floor copes best with Dubai heat and humidity?
Porcelain tile and SPC cope best with moisture and temperature swings. Engineered timber performs well in air conditioned rooms when the expansion gaps are right and the AC is not switched off for months.
Can you replace a few cracked or hollow tiles without redoing the floor?
Yes, where a matching tile is available. We lift the damaged tiles, clean out the bed, refix with the correct adhesive and regrout as close to the aged grout colour as we can.
Do you arrange the building permit in Trade Centre 2, Dubai?
Yes. Most buildings ask contractors for a work permit, trade licence, insurance and staff IDs, and a service lift booking. We submit all of it for you.
Do you work in the towers on both sides of Sheikh Zayed Road?
Yes. Apartments and offices on both sides are covered, from the Trade Centre end down towards Downtown. The permit and the lift booking are requested from the tower before the crew is confirmed.
How do I choose a company for epoxy flooring in Trade Centre 2, Dubai?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
Can you come to Trade Centre 2, Dubai at short notice?
Yes. Crews travel from our Barsha Heights base, and urgent work in Dubai is attended within two hours between 08:00 and 19:00, Monday to Saturday.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
