Al Khalidiyah
Flooring & Tiling in Khalidiya Palace Rayhaan, Al Khalidiyah
A flooring company for homes, offices and shops, covering tile, timber, vinyl, SPC, laminate and epoxy floors, plus regrouting and polishing. The MELLS carries this out in Khalidiya Palace Rayhaan, Al Khalidiyah with its own directly employed team and a named supervisor. We visit the property first and confirm the scope in a written quotation.
- Quotation
- Written, after a visit
- Response
- By appointment
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Flooring & Tiling at a glance
| Service | Flooring & Tiling |
|---|---|
| Also searched as | Flooring company in Khalidiya Palace Rayhaan, Al Khalidiyah, tile fixing in Khalidiya Palace Rayhaan, Al Khalidiyah, vinyl flooring in Khalidiya Palace Rayhaan, Al Khalidiyah |
| Location | Khalidiya Palace Rayhaan, Al Khalidiyah, Abu Dhabi |
| Property types | Villas and apartments |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Quoted per project, typically 1 to 2 days per room for click flooring and 3 to 7 days for tiling, including curing |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Visits in Abu Dhabi by appointment, Monday to Saturday |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
A floor is only as good as the surface beneath it. Slabs are often uneven, and moisture from a wet area or a ground floor slab will lift timber and vinyl within months. We test the subfloor for level and moisture, prepare it properly and leave expansion gaps sized for a home that swings between summer heat and constant AC.
- Subfloor level and moisture checks
- Removal of old flooring and adhesive
- Self levelling compound and primer
- Ceramic, porcelain and stone tile fixing
- Engineered timber, laminate and SPC click flooring
- Sheet vinyl and luxury vinyl tile
- Epoxy coatings for garages, stores and plant rooms
- Regrouting, grout restoration and tile polishing
- Skirtings, thresholds and door trimming
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Talk to a supervisor about flooring & tiling today.
Why choose The MELLS for flooring & tiling
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every flooring & tiling job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Flooring & Tiling in Khalidiya Palace Rayhaan: what we plan for
This can be booked on its own or as part of a wider visit, in a villa or an apartment.
Many Khalidiya towers run on central chilled water with a fan coil unit in each room. We clean coils and filters, flush condensate drains and check thermostats, and anything that belongs to the building plant is reported to building management.
Every tower needs a work permit from building management and a service lift booking before a crew can start. Khalidiya Village has gated security, so the resident registers our team ahead of time. What each building asks for is identified at the site visit and we prepare the paperwork.
What your quotation depends on
A quotation for flooring & tiling in Khalidiya Palace Rayhaan, Al Khalidiyah follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Flooring & Tiling services in Khalidiya Palace Rayhaan
Each one has its own scope and method.
Nearby in Al Khalidiyah
Questions about flooring & tiling in Khalidiya Palace Rayhaan
What does flooring & tiling include?
A flooring company for homes, offices and shops, covering tile, timber, vinyl, SPC, laminate and epoxy floors, plus regrouting and polishing. The work includes subfloor level and moisture checks; removal of old flooring and adhesive; self levelling compound and primer.
How much does flooring & tiling cost in Khalidiya Palace Rayhaan, Al Khalidiyah?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides flooring & tiling in Khalidiya Palace Rayhaan, Al Khalidiyah?
The MELLS provides flooring & tiling in Khalidiya Palace Rayhaan, Al Khalidiyah, Abu Dhabi. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does flooring & tiling take?
Typically quoted per project, typically 1 to 2 days per room for click flooring and 3 to 7 days for tiling, including curing. The time for your property is confirmed with the quotation.
Do I need permission from my building to change the floor?
Many apartment buildings ask for a work permit, and some set rules on acoustic underlay. We confirm the rules for your building at the site visit and prepare the permit paperwork it asks for.
Do you install flooring in Khalidiya Palace Rayhaan, Al Khalidiyah?
Yes. Our own floor layers and tilers work in villas, apartments, offices and shops across Abu Dhabi, and the site visit includes a level and moisture check of the existing floor.
Can new flooring go over my existing tiles?
Often, yes. SPC, laminate and vinyl can be laid over sound, level tiles once the grout lines are filled. We check door clearances and thresholds first, because the floor height rises.
How do your crews get access to Khalidiya Palace Rayhaan, Al Khalidiyah?
Every tower needs a work permit from building management and a service lift booking before a crew can start. Khalidiya Village has gated security, so the resident registers our team ahead of time. What each building asks for is identified at the site visit and we prepare the paperwork.
Do you work in Khalidiya Village as well as the towers?
Yes. Khalidiya Village homes are handled as house projects with gardens and pools in scope, while tower apartments are planned around the building permit and the lift booking.
How do I choose a company for flooring & tiling in Khalidiya Palace Rayhaan, Al Khalidiyah?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
How are visits to Khalidiya Palace Rayhaan, Al Khalidiyah arranged?
Visits in Abu Dhabi are booked by appointment between 08:00 and 19:00, Monday to Saturday. Call or send the form and we agree the earliest time a supervisor can come to you.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
