Dubai Marina & JBR
Office Renovation and Refurbishment in Princess Tower, Dubai Marina
The MELLS provides office renovation and refurbishment in Princess Tower, Dubai Marina with its own directly employed team. Refurbishment of an occupied office: new flooring, ceilings, lighting, paint and altered partitions, phased floor by floor or zone by zone so the premises keep working. We visit the property first and confirm the scope in a written quotation.
- Quotation
- Written, after a visit
- Response
- 2 hours in Dubai
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Office Renovation and Refurbishment at a glance
| Service | Office Renovation and Refurbishment |
|---|---|
| Location | Princess Tower, Dubai Marina |
| Premises | Offices, shops, clinics and other business premises |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Agreed at the site visit and planned around your trading hours |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Two hours in Dubai for urgent work, planned work within 48 hours |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
A fit out company for villas, apartments, offices and shops, building ceilings, partitions, joinery, flooring and finishes with its own trades. Most fit out delays in Dubai come from permits, building access rules and trades waiting on each other. We identify the approvals your building, master developer or the authorities ask for at the site visit, prepare that paperwork, and run every trade under one supervisor to a written programme.
- Phasing plan agreed with the tenant before the quotation
- Desks, screens and comms equipment protected or moved in stages
- Carpet tiles, ceiling tiles and light fittings replaced by zone
- Each zone cleaned and handed back before the next is started
How we carry out office renovation and refurbishment
An office in use cannot be stripped in one go, so the survey ends with a phasing plan. Staff move out of one zone, which is screened off with dust sheeting taped floor to ceiling. Inside it, old carpet tiles and ceiling tiles come out, partitions are altered, cabling and lighting are changed, then the walls are painted and new flooring goes down. The zone is vacuumed, wiped and handed back, and the team moves on to the next one in the order the programme sets out.
The usual failures are dust in the server room, a smoke detector set off by sanding, and a floor box buried under new carpet. In a tower, the building also controls when materials may travel in the service lift and when noisy work is allowed, and it asks for a work permit before anything starts. Moving a partition often means moving a sprinkler head or an AC grille above it. The site visit establishes those constraints and what the landlord fit out guide asks for.
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Talk to a supervisor about office renovation and refurbishment today.
Why choose The MELLS for office renovation and refurbishment
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every office renovation and refurbishment job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Office Renovation and Refurbishment in Princess Tower, Dubai Marina: what we plan for
Tower rules on permits, service lifts and working hours apply even to a short visit, and we arrange all three.
Sea air corrodes balcony AC units and fittings, so coils and drains are checked at every service.
Almost every tower requires a work permit from building management, a service lift booking and proof of insurance. Working hours are restricted, and noisy work is not allowed on some days.
What your quotation depends on
A quotation for office renovation and refurbishment in Princess Tower, Dubai Marina follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Related Fit Out & Renovation services in Princess Tower, Dubai Marina
Each one has its own scope and method.
Office Fit Out
Villa Renovation
Apartment Renovation
Kitchen Renovation
Bathroom Renovation
Retail Fit Out
Restaurant Fit Out
Joinery
Flooring Installation
Turnkey Fit Out
Clinic Fit Out
Salon and Spa Fit Out
Gym and Studio Fit Out
Cafe and Coffee Shop Fit Out
Showroom Fit Out
Nursery and Learning Centre Fit Out
Office Reinstatement and Make Good
Shell and Core Fit Out
Fit Out Design and Space Planning
Fit Out Approvals and Permits
Fit Out Snagging and Handover
Penthouse Renovation
Bedroom Renovation
Living Room Renovation
Home Office Fit Out
Home Cinema Room Fit Out
Fitted Wardrobes and Walk in Closets
Custom Kitchen Cabinets
TV Wall and Media Units
Wall Panelling and Cladding
Reception Desk and Feature Wall
Nearby in Dubai Marina & JBR
Questions about office renovation and refurbishment in Princess Tower, Dubai Marina
What does office renovation and refurbishment include?
Refurbishment of an occupied office: new flooring, ceilings, lighting, paint and altered partitions, phased floor by floor or zone by zone so the premises keep working. The work includes phasing plan agreed with the tenant before the quotation; desks, screens and comms equipment protected or moved in stages; carpet tiles, ceiling tiles and light fittings replaced by zone.
Can our staff keep working during the refurbishment?
In most offices, yes. The work is phased so that one zone is closed at a time, drilling and cutting are planned around your trading hours where the building allows, and the screened area is cleaned before it is reopened.
Do small changes to an office need building approval?
Buildings generally ask for a work permit for any contractor on site, and for drawings where partitions, ceilings, electrics or AC are altered. What yours asks for is confirmed with building management at the site visit, and we prepare the submission.
How much does office renovation and refurbishment cost in Princess Tower, Dubai Marina?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides office renovation and refurbishment in Princess Tower, Dubai Marina?
The MELLS provides office renovation and refurbishment in Princess Tower, Dubai Marina. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does office renovation and refurbishment take?
Typically agreed at the site visit and planned around your trading hours. The time for your property is confirmed with the quotation.
Do I need a permit to renovate my home or office?
Often, yes. Buildings, master developers and in some cases the authorities ask for approval before fit out work starts. We identify what applies at the site visit and prepare the paperwork they ask for.
Can you build from drawings prepared by our designer?
Yes. We build from your designer's drawings and specifications, and raise any buildability questions before the quotation is issued.
Do you take on structural work or extensions?
No. We do not take on structural alterations, extensions or any work that needs an engineer's stamp. Our scope is interior fit out, finishes and the services inside the existing structure.
Do you arrange the building permit in Princess Tower, Dubai Marina?
Yes. Most buildings ask contractors for a work permit, trade licence, insurance and staff IDs, and a service lift booking. We submit all of it for you.
Do you handle the building work permit?
Yes. We submit the permit, trade licence, insurance and staff IDs to building management and book the service lift.
How do I choose a company for office renovation and refurbishment in Princess Tower, Dubai Marina?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
Can you come to Princess Tower, Dubai Marina at short notice?
Yes. Crews travel from our Barsha Heights base, and urgent work in Dubai is attended within two hours between 08:00 and 19:00, Monday to Saturday.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
