Fit Out & Renovation
Living Room Renovation in Al Jurf
Living Room Renovation in Al Jurf by The MELLS. Living rooms are renovated around three things: where the screen and seating go, how the room is lit in the evening, and a floor that stands up to sun through large windows. We visit the property first and confirm the scope in a written quotation.
- Quotation
- Written, after a visit
- Response
- By appointment
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Living Room Renovation at a glance
| Service | Living Room Renovation |
|---|---|
| Location | Al Jurf, Abu Dhabi |
| Property types | Villas |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Quoted per project, typically 1 to 6 weeks depending on scope and approvals |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Visits in Abu Dhabi by appointment, Monday to Saturday |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
A fit out company for villas, apartments, offices and shops, building ceilings, partitions, joinery, flooring and finishes with its own trades. Most fit out delays in Abu Dhabi come from permits, building access rules and trades waiting on each other. We identify the approvals your building, master developer or the authorities ask for at the site visit, prepare that paperwork, and run every trade under one supervisor to a written programme.
- Furniture plan drawn first so sockets and lights land correctly
- Ceiling coves and curtain pockets formed in gypsum
- Media wall or shelving made to the measured drawings
- Floor finish chosen for strong sun and for long summer closures
How we carry out living room renovation
A furniture plan is drawn before any trade starts, since it decides where floor sockets, wall lights and the screen go. Ceiling work comes first: a dropped border for cove lighting, a pocket for the curtain track and any change to the AC grilles. Electrical points are chased in and the walls are made good. The floor is then laid or refinished. Joinery arrives last and is scribed to the walls, and the decorators return for the final coat once it is fixed.
Large south and west facing windows are hard on a living room. Timber floors fade in a line where the rug ends, dark veneers bleach, and glue down flooring can lift if the home is shut with the AC off through August. In apartments the ceiling void is shallow and already full of ducts and sprinkler pipes, which limits how deep a cove or recessed light can be. The site visit measures that void and notes the sun path before finishes are chosen.
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Talk to a supervisor about living room renovation today.
Why choose The MELLS for living room renovation
What an ordinary job leaves out, and what you can hold us to.
| Point | An ordinary job | The MELLS |
|---|---|---|
| Quotation | A figure over the phone, with extras added on the day | A written quotation after a site visit, and nothing added on the day |
| Team | Crews supplied through agencies or subcontractors | Crew directly employed by The MELLS, with a named supervisor |
| Method | Parts replaced until the fault goes away | The fault is found, measured and explained before any part is replaced |
| Handover | The job ends when the crew leaves | A measured test for every job, with photographs before and after |
| Aftercare | A return visit is charged | A failed check is put right free of charge within 48 hours |
Our commitments on every living room renovation job
The same standard on a single room or a whole estate.
Written quotation
The scope is fixed in writing before any work begins.
Named supervisor
One person is responsible for your job from the visit to handover.
Checked before handover
A measured test for every job, with photographs before and after.
Put right within 48 hours
If a check fails, we come back and correct it free of charge.
Fully insured
Our work in your home or premises is covered by insurance.
Discreet crews
Uniformed, briefed on your house rules and respectful of your privacy.
Living Room Renovation in Al Jurf: what we plan for
Al Jurf is a coastal destination on the Abu Dhabi side of the border with Abu Dhabi, near Ghantoot, with beaches, a nature reserve and wellness focused developments such as SHA Residences Emirates, where apartments and beach villas with private pools are being handed over.
Beachfront homes collect salt on glass and outdoor metal, and the open coast brings sand onto terraces and into pools. Coastal air is hard on condensers and pool equipment, so regular coil cleaning and a pool plant check are worth planning.
Developments are gated. Contractor visits are registered by the owner with the community or the residence management.
What your quotation depends on
A quotation for living room renovation in Al Jurf follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Related Fit Out & Renovation services in Al Jurf
Each one has its own scope and method.
Office Fit Out
Villa Renovation
Kitchen Renovation
Bathroom Renovation
Retail Fit Out
Restaurant Fit Out
Joinery
Flooring Installation
Turnkey Fit Out
Fit Out Design and Space Planning
Fit Out Approvals and Permits
Fit Out Snagging and Handover
Townhouse Renovation
Bedroom Renovation
Majlis Fit Out
Home Office Fit Out
Home Cinema Room Fit Out
Fitted Wardrobes and Walk in Closets
Custom Kitchen Cabinets
TV Wall and Media Units
Wall Panelling and Cladding
Staircase and Balustrade Works
Living Room Renovation across Al Jurf
Questions about living room renovation in Al Jurf
What does living room renovation include?
Living rooms are renovated around three things: where the screen and seating go, how the room is lit in the evening, and a floor that stands up to sun through large windows. The work includes furniture plan drawn first so sockets and lights land correctly; ceiling coves and curtain pockets formed in gypsum; media wall or shelving made to the measured drawings.
Can floor sockets be added under the sofa?
On a villa ground floor, usually yes, by chasing a conduit into the screed before the new floor is laid. Apartment buildings rarely allow the slab to be cut, so power is brought through the screed depth where there is one, or along a skirting.
Should the ceiling or the floor be done first?
Ceiling first, always. Gypsum dust, paint spots and scaffold feet all end up on the floor, so the ceiling, electrics and first coats are finished before any new floor is laid. Joinery and the last coat of paint follow the floor.
How much does living room renovation cost in Al Jurf?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides living room renovation in Al Jurf?
The MELLS provides living room renovation in Al Jurf, Abu Dhabi. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does living room renovation take?
Typically quoted per project, typically 1 to 6 weeks depending on scope and approvals. The time for your property is confirmed with the quotation.
Do you take on structural work or extensions?
No. We do not take on structural alterations, extensions or any work that needs an engineer's stamp. Our scope is interior fit out, finishes and the services inside the existing structure.
Can we stay in the property during the renovation?
For a single room or one bathroom, usually yes, with the work area sealed off and cleaned down each day. For a whole home renovation we recommend moving out until handover.
Do you carry out fit out and renovation work in Al Jurf?
Yes. Our own trades work across Abu Dhabi, and the site visit confirms the access rules, working hours and approvals that apply to your building or community.
How do your crews get access to Al Jurf?
Developments are gated. Contractor visits are registered by the owner with the community or the residence management.
Do we need Imkan approval for work in Al Jurf?
Cleaning, AC servicing and repairs inside the home only need the gate or building pass, which the resident arranges. Exterior painting, waterproofing, fit out and any change to the facade, roof or garden structures need a no objection certificate from Imkan or the community management in Al Jurf before work starts. We prepare the method statement, drawings, insurance and trade licence documents the approval asks for.
How do I choose a company for living room renovation in Al Jurf?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
How are visits to Al Jurf arranged?
Visits in Abu Dhabi are booked by appointment between 08:00 and 19:00, Monday to Saturday. Call or send the form and we agree the earliest time a supervisor can come to you.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.
